研发项目成本和进度的现实性——风险分析方法

D. Borgman, J. Hwang
{"title":"研发项目成本和进度的现实性——风险分析方法","authors":"D. Borgman, J. Hwang","doi":"10.1109/CDC.1975.270600","DOIUrl":null,"url":null,"abstract":"All project managers strive for cost and schedule realism. The Department of the Army has established a novel concept called the \"Total Risk Assessing Cost Estimate (TRACE)\" to develop a new program cost-estimation procedure for research, development, test and evaluation cost realism. Such a procedure properly accommodates program uncertainties/ risks inherent to specific work elements, and the high-risk work elements are budgeted accordingly. The purpose of this paper is to propose such a procedure which subscribes to a risk analysis approach and satisfies the essential elements of the TRACE concept. The procedure consists of two models: a cost impact model and a schedule variance model. Applications of the procedure to the NASA/Army Tilt Rotor Research Aircraft Project are also presented for illustration.","PeriodicalId":164707,"journal":{"name":"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes","volume":"87 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1975-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"R. & D. project cost and schedule realism-A risk analysis approach\",\"authors\":\"D. Borgman, J. Hwang\",\"doi\":\"10.1109/CDC.1975.270600\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"All project managers strive for cost and schedule realism. The Department of the Army has established a novel concept called the \\\"Total Risk Assessing Cost Estimate (TRACE)\\\" to develop a new program cost-estimation procedure for research, development, test and evaluation cost realism. Such a procedure properly accommodates program uncertainties/ risks inherent to specific work elements, and the high-risk work elements are budgeted accordingly. The purpose of this paper is to propose such a procedure which subscribes to a risk analysis approach and satisfies the essential elements of the TRACE concept. The procedure consists of two models: a cost impact model and a schedule variance model. Applications of the procedure to the NASA/Army Tilt Rotor Research Aircraft Project are also presented for illustration.\",\"PeriodicalId\":164707,\"journal\":{\"name\":\"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes\",\"volume\":\"87 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1975-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CDC.1975.270600\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.1975.270600","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

所有的项目经理都力求成本和进度的现实性。陆军部已经建立了一个名为“总风险评估成本估算(TRACE)”的新概念,以开发一种新的项目成本估算程序,用于研究、开发、测试和评估成本的现实性。这样的程序适当地适应特定工作要素固有的方案不确定性/风险,并相应地对高风险工作要素进行预算。本文的目的是提出这样一种程序,它支持风险分析方法,并满足TRACE概念的基本要素。该过程包括两个模型:成本影响模型和进度差异模型。该程序在NASA/陆军倾斜旋翼研究飞机项目中的应用也作了说明。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
R. & D. project cost and schedule realism-A risk analysis approach
All project managers strive for cost and schedule realism. The Department of the Army has established a novel concept called the "Total Risk Assessing Cost Estimate (TRACE)" to develop a new program cost-estimation procedure for research, development, test and evaluation cost realism. Such a procedure properly accommodates program uncertainties/ risks inherent to specific work elements, and the high-risk work elements are budgeted accordingly. The purpose of this paper is to propose such a procedure which subscribes to a risk analysis approach and satisfies the essential elements of the TRACE concept. The procedure consists of two models: a cost impact model and a schedule variance model. Applications of the procedure to the NASA/Army Tilt Rotor Research Aircraft Project are also presented for illustration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信