1915年恰纳卡莱大桥的混合解决方案

M. Virlogeux, J. Klein, Thierry Delémont, Laurent Gaudry, Emilie Bellanger
{"title":"1915年恰纳卡莱大桥的混合解决方案","authors":"M. Virlogeux, J. Klein, Thierry Delémont, Laurent Gaudry, Emilie Bellanger","doi":"10.2749/istanbul.2023.0783","DOIUrl":null,"url":null,"abstract":"The name “Hybrid Bridges” is intended to apply to bridges which are a combination of both a suspended bridge (with parabolic main cables and hangers) and cable stayed bridges. The 3rd Bosphorus Bridge (Yavuz Sultan Selim Bridge) is one of the few modern hybrid bridges built in the recent years. The choice of a hybrid solution was mainly motivated by the requirements related to a railway bridge (loads, allowed deformations, etc.) in relation with an elegant streamlined bridge deck. At early stages of the 1915 Çanakkale Bridge project, we have studied both a classical suspended solution and an hybrid proposal. Although the requirements and constraints are very different from the 3rd Bosphorus Bridge, the hybrid bridge solution turned out to be competitive in terms of costs and construction schedule. The aim of the paper will be to recall the reasons that lead to the hybrid solution for the 3rd Bosphorus Bridge and then compare the suspended and hybrid solutions for the 1915 Çanakkale Bridge.","PeriodicalId":237396,"journal":{"name":"IABSE Symposium, Istanbul 2023: Long Span Bridges","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Hybrid solution for the 1915 Canakkale Bridge\",\"authors\":\"M. Virlogeux, J. Klein, Thierry Delémont, Laurent Gaudry, Emilie Bellanger\",\"doi\":\"10.2749/istanbul.2023.0783\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The name “Hybrid Bridges” is intended to apply to bridges which are a combination of both a suspended bridge (with parabolic main cables and hangers) and cable stayed bridges. The 3rd Bosphorus Bridge (Yavuz Sultan Selim Bridge) is one of the few modern hybrid bridges built in the recent years. The choice of a hybrid solution was mainly motivated by the requirements related to a railway bridge (loads, allowed deformations, etc.) in relation with an elegant streamlined bridge deck. At early stages of the 1915 Çanakkale Bridge project, we have studied both a classical suspended solution and an hybrid proposal. Although the requirements and constraints are very different from the 3rd Bosphorus Bridge, the hybrid bridge solution turned out to be competitive in terms of costs and construction schedule. The aim of the paper will be to recall the reasons that lead to the hybrid solution for the 3rd Bosphorus Bridge and then compare the suspended and hybrid solutions for the 1915 Çanakkale Bridge.\",\"PeriodicalId\":237396,\"journal\":{\"name\":\"IABSE Symposium, Istanbul 2023: Long Span Bridges\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IABSE Symposium, Istanbul 2023: Long Span Bridges\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2749/istanbul.2023.0783\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Istanbul 2023: Long Span Bridges","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/istanbul.2023.0783","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

“混合式桥梁”的名称旨在适用于悬索桥(带有抛物线主缆和吊架)和斜拉桥的组合。第三博斯普鲁斯大桥(Yavuz Sultan Selim Bridge)是近年来建造的少数现代混合桥梁之一。选择混合解决方案的主要动机是与铁路桥相关的要求(载荷,允许变形等)与优雅的流线型桥面有关。在1915年Çanakkale大桥项目的早期阶段,我们研究了经典的悬架解决方案和混合方案。尽管要求和限制与第三博斯普鲁斯大桥非常不同,但混合桥解决方案在成本和施工进度方面具有竞争力。本文的目的是回顾导致第三博斯普鲁斯大桥混合解决方案的原因,然后比较1915年Çanakkale大桥的悬吊和混合解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Hybrid solution for the 1915 Canakkale Bridge
The name “Hybrid Bridges” is intended to apply to bridges which are a combination of both a suspended bridge (with parabolic main cables and hangers) and cable stayed bridges. The 3rd Bosphorus Bridge (Yavuz Sultan Selim Bridge) is one of the few modern hybrid bridges built in the recent years. The choice of a hybrid solution was mainly motivated by the requirements related to a railway bridge (loads, allowed deformations, etc.) in relation with an elegant streamlined bridge deck. At early stages of the 1915 Çanakkale Bridge project, we have studied both a classical suspended solution and an hybrid proposal. Although the requirements and constraints are very different from the 3rd Bosphorus Bridge, the hybrid bridge solution turned out to be competitive in terms of costs and construction schedule. The aim of the paper will be to recall the reasons that lead to the hybrid solution for the 3rd Bosphorus Bridge and then compare the suspended and hybrid solutions for the 1915 Çanakkale Bridge.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信