使用资源和投资组合管理解决方案使IT投资与业务保持一致

Rongzeng Cao, Wei Ding, C. Tian
{"title":"使用资源和投资组合管理解决方案使IT投资与业务保持一致","authors":"Rongzeng Cao, Wei Ding, C. Tian","doi":"10.1504/IJEB.2006.010864","DOIUrl":null,"url":null,"abstract":"With business survival increasingly tied to technology performance, CIOs and their IT organizations should be able to map, relate, and articulate IT spending and productivity to business revenue to support their value proposition. There is a rise in the use of project portfolio management as IT organizations shift to provide customer driven solutions. Implementing a project portfolio management process is crucial to optimizing corporate investments under shared service environment. This paper reviews actions that CIO can take to create an environment for more successful projects in the IT organizations. Specifically, the authors discuss some key advanced technologies such as resource allocation, together with major experiences gained from a bank in Asia Pacific","PeriodicalId":118472,"journal":{"name":"IEEE International Conference on e-Business Engineering (ICEBE'05)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Using resource and portfolio management solution to align IT investment with business\",\"authors\":\"Rongzeng Cao, Wei Ding, C. Tian\",\"doi\":\"10.1504/IJEB.2006.010864\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With business survival increasingly tied to technology performance, CIOs and their IT organizations should be able to map, relate, and articulate IT spending and productivity to business revenue to support their value proposition. There is a rise in the use of project portfolio management as IT organizations shift to provide customer driven solutions. Implementing a project portfolio management process is crucial to optimizing corporate investments under shared service environment. This paper reviews actions that CIO can take to create an environment for more successful projects in the IT organizations. Specifically, the authors discuss some key advanced technologies such as resource allocation, together with major experiences gained from a bank in Asia Pacific\",\"PeriodicalId\":118472,\"journal\":{\"name\":\"IEEE International Conference on e-Business Engineering (ICEBE'05)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-10-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE International Conference on e-Business Engineering (ICEBE'05)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJEB.2006.010864\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE International Conference on e-Business Engineering (ICEBE'05)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJEB.2006.010864","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

随着业务生存越来越多地与技术性能联系在一起,首席信息官和他们的IT组织应该能够将IT支出和生产力映射、关联和阐明到业务收入中,以支持他们的价值主张。随着IT组织转向提供客户驱动的解决方案,项目组合管理的使用也在增加。实现项目组合管理过程对于优化共享服务环境下的企业投资至关重要。本文回顾了CIO在IT组织中为更成功的项目创建环境时可以采取的行动。具体而言,作者讨论了一些关键的先进技术,如资源配置,以及从亚太地区一家银行获得的主要经验
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Using resource and portfolio management solution to align IT investment with business
With business survival increasingly tied to technology performance, CIOs and their IT organizations should be able to map, relate, and articulate IT spending and productivity to business revenue to support their value proposition. There is a rise in the use of project portfolio management as IT organizations shift to provide customer driven solutions. Implementing a project portfolio management process is crucial to optimizing corporate investments under shared service environment. This paper reviews actions that CIO can take to create an environment for more successful projects in the IT organizations. Specifically, the authors discuss some key advanced technologies such as resource allocation, together with major experiences gained from a bank in Asia Pacific
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信