{"title":"用于污水处理厂自优化控制的非线性无偏置MPC","authors":"M. Francisco, P. Vega, S. Skogestad","doi":"10.1109/ICSTCC.2015.7321325","DOIUrl":null,"url":null,"abstract":"This paper describes the application of an offset free nonlinear model predictive controller (NMPC) to regulate the self-optimizing variables and active constraints in a wastewater treatment plant, particularly the activated sludge process using the benchmark simulation model No. 1 (BSM1). A set of terminal constraints have been added to the NMPC formulation in order to ensure stability. The procedure to find the self-optimizing variables as the best controlled variables in an economic sense, has also been described briefly, considering the most important measurements of the process. This methodology provides the optimum combination of measurements to keep constant with minimum economic loss. The simulation results show good reference tracking for typical average load disturbances.","PeriodicalId":257135,"journal":{"name":"2015 19th International Conference on System Theory, Control and Computing (ICSTCC)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Nonlinear offset free MPC for self-optimizing control in wastewater treatment plants\",\"authors\":\"M. Francisco, P. Vega, S. Skogestad\",\"doi\":\"10.1109/ICSTCC.2015.7321325\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes the application of an offset free nonlinear model predictive controller (NMPC) to regulate the self-optimizing variables and active constraints in a wastewater treatment plant, particularly the activated sludge process using the benchmark simulation model No. 1 (BSM1). A set of terminal constraints have been added to the NMPC formulation in order to ensure stability. The procedure to find the self-optimizing variables as the best controlled variables in an economic sense, has also been described briefly, considering the most important measurements of the process. This methodology provides the optimum combination of measurements to keep constant with minimum economic loss. The simulation results show good reference tracking for typical average load disturbances.\",\"PeriodicalId\":257135,\"journal\":{\"name\":\"2015 19th International Conference on System Theory, Control and Computing (ICSTCC)\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 19th International Conference on System Theory, Control and Computing (ICSTCC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSTCC.2015.7321325\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 19th International Conference on System Theory, Control and Computing (ICSTCC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSTCC.2015.7321325","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文描述了一个无偏移非线性模型预测控制器(NMPC)的应用,以调节污水处理厂的自优化变量和主动约束,特别是使用基准模拟模型1号(BSM1)的活性污泥过程。为了确保稳定性,在NMPC公式中增加了一组终端约束。考虑到过程中最重要的测量值,还简要描述了在经济意义上寻找自优化变量作为最佳控制变量的过程。该方法提供了最佳的测量组合,以保持恒定,最小的经济损失。仿真结果表明,该方法对典型的平均负载扰动具有良好的参考跟踪能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Nonlinear offset free MPC for self-optimizing control in wastewater treatment plants
This paper describes the application of an offset free nonlinear model predictive controller (NMPC) to regulate the self-optimizing variables and active constraints in a wastewater treatment plant, particularly the activated sludge process using the benchmark simulation model No. 1 (BSM1). A set of terminal constraints have been added to the NMPC formulation in order to ensure stability. The procedure to find the self-optimizing variables as the best controlled variables in an economic sense, has also been described briefly, considering the most important measurements of the process. This methodology provides the optimum combination of measurements to keep constant with minimum economic loss. The simulation results show good reference tracking for typical average load disturbances.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信