影响尼日利亚特许基础PPP项目中私人方义务范围的因素

A. Opawole, G. O. Jagboro
{"title":"影响尼日利亚特许基础PPP项目中私人方义务范围的因素","authors":"A. Opawole, G. O. Jagboro","doi":"10.1108/SS-01-2016-0003","DOIUrl":null,"url":null,"abstract":"Purpose \n \n \n \n– Little success had been recorded on concession-based public private partnership contracts in Nigeria for reasons attributable in part to poor assessment of the socio-cultural and economic factors that contribute to the parties’ costs while preparing contract packages. The purpose of this paper is to assess the factors which significantly influence the private party’s obligations and costs in a concession-based contract thereby enhancing the robust assessment of contract packages when bidding by private investors. \n \n \n \n \nDesign/methodology/approach \n \n \n \n– The assessment was based on primary data obtained through questionnaire survey. Structured questionnaire was administered on professionals comprising architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers who had been involved in concession-based contracts in the Southwestern Nigeria, selected using respondent-driven sampling approach. Factors evaluated were those identified through in-depth literature review and brainstorming of those pertinent to concession transaction in Nigeria. Data collected were analysed using descriptive statistics including mean, relative significance index, impact weighting and factor analysis. \n \n \n \n \nFindings \n \n \n \n– Significant factors that influence private party’s cost were found to be political interference, delay in land acquisition, variation to the contract and non-availability of supportive infrastructure. \n \n \n \n \nOriginality/value \n \n \n \n– Findings provided information for structuring concession contract for effective management of country-specific characteristics in concession contract. The understanding of the factors that affect private party’s obligations and costs would guide effective assessment of concession contract in developing economies by foreign investors. Moreover, the study provided implication for the understating of country-specific factors affecting concession contract in Nigeria which would contribute to robust assessment of contract packages when bidding by private investors.","PeriodicalId":118605,"journal":{"name":"Structural Survey","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Factors influencing the scope of private party’s obligations in concession-based PPP projects in Nigeria\",\"authors\":\"A. Opawole, G. O. Jagboro\",\"doi\":\"10.1108/SS-01-2016-0003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose \\n \\n \\n \\n– Little success had been recorded on concession-based public private partnership contracts in Nigeria for reasons attributable in part to poor assessment of the socio-cultural and economic factors that contribute to the parties’ costs while preparing contract packages. The purpose of this paper is to assess the factors which significantly influence the private party’s obligations and costs in a concession-based contract thereby enhancing the robust assessment of contract packages when bidding by private investors. \\n \\n \\n \\n \\nDesign/methodology/approach \\n \\n \\n \\n– The assessment was based on primary data obtained through questionnaire survey. Structured questionnaire was administered on professionals comprising architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers who had been involved in concession-based contracts in the Southwestern Nigeria, selected using respondent-driven sampling approach. Factors evaluated were those identified through in-depth literature review and brainstorming of those pertinent to concession transaction in Nigeria. Data collected were analysed using descriptive statistics including mean, relative significance index, impact weighting and factor analysis. \\n \\n \\n \\n \\nFindings \\n \\n \\n \\n– Significant factors that influence private party’s cost were found to be political interference, delay in land acquisition, variation to the contract and non-availability of supportive infrastructure. \\n \\n \\n \\n \\nOriginality/value \\n \\n \\n \\n– Findings provided information for structuring concession contract for effective management of country-specific characteristics in concession contract. The understanding of the factors that affect private party’s obligations and costs would guide effective assessment of concession contract in developing economies by foreign investors. Moreover, the study provided implication for the understating of country-specific factors affecting concession contract in Nigeria which would contribute to robust assessment of contract packages when bidding by private investors.\",\"PeriodicalId\":118605,\"journal\":{\"name\":\"Structural Survey\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-08-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Structural Survey\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/SS-01-2016-0003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structural Survey","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/SS-01-2016-0003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

目的-在尼日利亚,以特许权为基础的公私伙伴关系合同几乎没有取得成功,部分原因是在编制一揽子合同时对造成各方成本的社会文化和经济因素评估不佳。本文的目的是评估在特许合同中显著影响私人方义务和成本的因素,从而增强私人投资者投标时对合同包的稳健评估。设计/方法/方法-评估基于通过问卷调查获得的原始数据。采用受访者驱动抽样方法,对参与尼日利亚西南部特许合同的建筑师、房地产测量师、工料测量师、工程师和建筑商、会计师/银行家/经济学家和律师等专业人士进行了结构化问卷调查。评估的因素是通过深入的文献回顾和对尼日利亚特许交易相关因素的头脑风暴确定的因素。采用描述性统计方法对收集到的数据进行分析,包括平均值、相对显著性指数、影响加权和因子分析。调查结果-影响私人成本的重要因素是政治干预、土地征用延迟、合同变更和无法获得支持性基础设施。独创性/价值-研究结果为构建特许合同提供了信息,以便有效管理特许合同中的国别特征。了解影响私营方义务和成本的因素将指导外国投资者对发展中经济体特许权合同的有效评估。此外,该研究对低估影响尼日利亚特许合同的具体国家因素提供了启示,这将有助于私人投资者在投标时对一揽子合同进行有力的评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factors influencing the scope of private party’s obligations in concession-based PPP projects in Nigeria
Purpose – Little success had been recorded on concession-based public private partnership contracts in Nigeria for reasons attributable in part to poor assessment of the socio-cultural and economic factors that contribute to the parties’ costs while preparing contract packages. The purpose of this paper is to assess the factors which significantly influence the private party’s obligations and costs in a concession-based contract thereby enhancing the robust assessment of contract packages when bidding by private investors. Design/methodology/approach – The assessment was based on primary data obtained through questionnaire survey. Structured questionnaire was administered on professionals comprising architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers who had been involved in concession-based contracts in the Southwestern Nigeria, selected using respondent-driven sampling approach. Factors evaluated were those identified through in-depth literature review and brainstorming of those pertinent to concession transaction in Nigeria. Data collected were analysed using descriptive statistics including mean, relative significance index, impact weighting and factor analysis. Findings – Significant factors that influence private party’s cost were found to be political interference, delay in land acquisition, variation to the contract and non-availability of supportive infrastructure. Originality/value – Findings provided information for structuring concession contract for effective management of country-specific characteristics in concession contract. The understanding of the factors that affect private party’s obligations and costs would guide effective assessment of concession contract in developing economies by foreign investors. Moreover, the study provided implication for the understating of country-specific factors affecting concession contract in Nigeria which would contribute to robust assessment of contract packages when bidding by private investors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信