基于RE变异性和不确定性的先进储量分级方法评价

S. Miladinova, F. Bourry
{"title":"基于RE变异性和不确定性的先进储量分级方法评价","authors":"S. Miladinova, F. Bourry","doi":"10.1049/icp.2021.2497","DOIUrl":null,"url":null,"abstract":"The large-scale integration of variable renewable energy (RE) into the electricity mix imposes to deal with the uncertainty and variability associated with such generation. As a result, the power system reserve management, which aims to ensure real-time balancing between production and load, has to evolve in order to guarantee the reliable operation of the electrical grid. This paper focuses on the evaluation of advanced reserve sizing methods identified in the literature, based on real operation data, from RE plants under operation. More precisely, the paper details a field-data oriented analysis, where fine time-resolution (few minutes time step) data is analyzed (1) to characterize RE variability and uncertainty, and (2) to evaluate the benefits from taking into account such variability and uncertainty for advanced reserve sizing.","PeriodicalId":186086,"journal":{"name":"11th Solar & Storage Power System Integration Workshop (SIW 2021)","volume":"95 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of advanced reserve sizing methods based on RE variability and uncertainty\",\"authors\":\"S. Miladinova, F. Bourry\",\"doi\":\"10.1049/icp.2021.2497\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The large-scale integration of variable renewable energy (RE) into the electricity mix imposes to deal with the uncertainty and variability associated with such generation. As a result, the power system reserve management, which aims to ensure real-time balancing between production and load, has to evolve in order to guarantee the reliable operation of the electrical grid. This paper focuses on the evaluation of advanced reserve sizing methods identified in the literature, based on real operation data, from RE plants under operation. More precisely, the paper details a field-data oriented analysis, where fine time-resolution (few minutes time step) data is analyzed (1) to characterize RE variability and uncertainty, and (2) to evaluate the benefits from taking into account such variability and uncertainty for advanced reserve sizing.\",\"PeriodicalId\":186086,\"journal\":{\"name\":\"11th Solar & Storage Power System Integration Workshop (SIW 2021)\",\"volume\":\"95 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th Solar & Storage Power System Integration Workshop (SIW 2021)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/icp.2021.2497\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th Solar & Storage Power System Integration Workshop (SIW 2021)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/icp.2021.2497","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

可变可再生能源(RE)大规模整合到电力结构中,要求处理与此类发电相关的不确定性和可变性。因此,为了保证电网的可靠运行,以保证生产与负荷实时平衡为目标的电力系统储备管理必须不断发展。本文以运行中的可再生能源电厂的实际运行数据为基础,对文献中确定的先进储量分级方法进行了评价。更准确地说,本文详细介绍了面向现场数据的分析,其中分析了精细的时间分辨率(几分钟时间步长)数据(1)来表征RE的可变性和不确定性,(2)来评估考虑这种可变性和不确定性对高级储量规模的好处。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation of advanced reserve sizing methods based on RE variability and uncertainty
The large-scale integration of variable renewable energy (RE) into the electricity mix imposes to deal with the uncertainty and variability associated with such generation. As a result, the power system reserve management, which aims to ensure real-time balancing between production and load, has to evolve in order to guarantee the reliable operation of the electrical grid. This paper focuses on the evaluation of advanced reserve sizing methods identified in the literature, based on real operation data, from RE plants under operation. More precisely, the paper details a field-data oriented analysis, where fine time-resolution (few minutes time step) data is analyzed (1) to characterize RE variability and uncertainty, and (2) to evaluate the benefits from taking into account such variability and uncertainty for advanced reserve sizing.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信