W. Yen, Shih-Hsu Huang, Chun-Hua Cheng
{"title":"同时运行调度和运行延迟选择以最小化周期功率差","authors":"W. Yen, Shih-Hsu Huang, Chun-Hua Cheng","doi":"10.1007/978-3-540-77090-9_59","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":267903,"journal":{"name":"EUC Workshops","volume":"295 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Simultaneous Operation Scheduling and Operation Delay Selection to Minimize Cycle-by-Cycle Power Differential\",\"authors\":\"W. Yen, Shih-Hsu Huang, Chun-Hua Cheng\",\"doi\":\"10.1007/978-3-540-77090-9_59\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":267903,\"journal\":{\"name\":\"EUC Workshops\",\"volume\":\"295 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-12-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EUC Workshops\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/978-3-540-77090-9_59\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EUC Workshops","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-540-77090-9_59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1