考虑电力市场不同发展阶段的虚拟电厂最优调度策略

Yunlei Zhang, Kan Yang, B. Zheng, Guorong Zhu, Dixin Wang, S. Li, K. Xu, Teng Tu
{"title":"考虑电力市场不同发展阶段的虚拟电厂最优调度策略","authors":"Yunlei Zhang, Kan Yang, B. Zheng, Guorong Zhu, Dixin Wang, S. Li, K. Xu, Teng Tu","doi":"10.1109/ACPEE51499.2021.9436861","DOIUrl":null,"url":null,"abstract":"This paper investigates the scheduling strategies for the virtual power plant (VPP) considering different development stages of the electricity market. Firstly, the operation models are formulated to characterize the aggregated components of VPP, including the distributed photovoltaic (PV), wind turbines, demand resources (DRs), electric vehicles (EV) and combined heat and power (CHP) unit as well as conventional units. Next, different operating frameworks have been proposed in order to derive the scheduling strategies of VPP for different development stages of the electricity market. Specifically, a price taker-based scheduling model is developed for VPP during the early stage of market construction. For the mature stage of market development, a bi-level framework is introduced to simulate the bidding and scheduling strategies of VPP acting as active participates. Moreover, the bi-level framework is further recast as a solvable problem. The proposed method is capable to characterize the scheduling strategies of VPP in different stages of market development.","PeriodicalId":127882,"journal":{"name":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Optimal Scheduling Strategies of the Virtual Power Plant Considering Different Development Stages of the Electricity Market\",\"authors\":\"Yunlei Zhang, Kan Yang, B. Zheng, Guorong Zhu, Dixin Wang, S. Li, K. Xu, Teng Tu\",\"doi\":\"10.1109/ACPEE51499.2021.9436861\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates the scheduling strategies for the virtual power plant (VPP) considering different development stages of the electricity market. Firstly, the operation models are formulated to characterize the aggregated components of VPP, including the distributed photovoltaic (PV), wind turbines, demand resources (DRs), electric vehicles (EV) and combined heat and power (CHP) unit as well as conventional units. Next, different operating frameworks have been proposed in order to derive the scheduling strategies of VPP for different development stages of the electricity market. Specifically, a price taker-based scheduling model is developed for VPP during the early stage of market construction. For the mature stage of market development, a bi-level framework is introduced to simulate the bidding and scheduling strategies of VPP acting as active participates. Moreover, the bi-level framework is further recast as a solvable problem. The proposed method is capable to characterize the scheduling strategies of VPP in different stages of market development.\",\"PeriodicalId\":127882,\"journal\":{\"name\":\"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACPEE51499.2021.9436861\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE51499.2021.9436861","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文研究了考虑电力市场不同发展阶段的虚拟电厂调度策略。首先,建立了VPP的运行模型,描述了VPP的聚合组件,包括分布式光伏(PV)、风力发电机组、需求资源(DRs)、电动汽车(EV)和热电联产(CHP)机组以及常规机组。其次,提出了不同的运行框架,推导出电力市场不同发展阶段的VPP调度策略。具体而言,在市场建设初期,建立了基于价格接受者的VPP调度模型。针对市场发展成熟阶段,引入双层框架,模拟VPP作为主动参与者的竞价和调度策略。此外,将双层框架进一步重塑为一个可解决的问题。该方法能够表征VPP在不同市场发展阶段的调度策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal Scheduling Strategies of the Virtual Power Plant Considering Different Development Stages of the Electricity Market
This paper investigates the scheduling strategies for the virtual power plant (VPP) considering different development stages of the electricity market. Firstly, the operation models are formulated to characterize the aggregated components of VPP, including the distributed photovoltaic (PV), wind turbines, demand resources (DRs), electric vehicles (EV) and combined heat and power (CHP) unit as well as conventional units. Next, different operating frameworks have been proposed in order to derive the scheduling strategies of VPP for different development stages of the electricity market. Specifically, a price taker-based scheduling model is developed for VPP during the early stage of market construction. For the mature stage of market development, a bi-level framework is introduced to simulate the bidding and scheduling strategies of VPP acting as active participates. Moreover, the bi-level framework is further recast as a solvable problem. The proposed method is capable to characterize the scheduling strategies of VPP in different stages of market development.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信