{"title":"重构感知任务图调度","authors":"H. Kooti, E. Bozorgzadeh","doi":"10.1109/EUC.2015.33","DOIUrl":null,"url":null,"abstract":"Due to increasing demand for reconfigurability in embedded systems, real-time task scheduling is challenged by non-negligible reconfiguration overheads. We introduce the problem of real-time task scheduling under reconfiguration overhead on heterogeneous reconfigurable systems while considering the data dependencies and data communication overhead. We introduce a novel graph representation which captures the delay overhead due to data dependencies and reconfiguration. We formulate the problem as a network flow problem and provide a mixed integer linear programming solution to minimize the completion time so called makespan. Results show that our proposed scheduling improves the makespan by 24.20% (on average) in comparison with maximum-transition-overhead scheduling.","PeriodicalId":299207,"journal":{"name":"2015 IEEE 13th International Conference on Embedded and Ubiquitous Computing","volume":"206 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Reconfiguration-Aware Task Graph Scheduling\",\"authors\":\"H. Kooti, E. Bozorgzadeh\",\"doi\":\"10.1109/EUC.2015.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Due to increasing demand for reconfigurability in embedded systems, real-time task scheduling is challenged by non-negligible reconfiguration overheads. We introduce the problem of real-time task scheduling under reconfiguration overhead on heterogeneous reconfigurable systems while considering the data dependencies and data communication overhead. We introduce a novel graph representation which captures the delay overhead due to data dependencies and reconfiguration. We formulate the problem as a network flow problem and provide a mixed integer linear programming solution to minimize the completion time so called makespan. Results show that our proposed scheduling improves the makespan by 24.20% (on average) in comparison with maximum-transition-overhead scheduling.\",\"PeriodicalId\":299207,\"journal\":{\"name\":\"2015 IEEE 13th International Conference on Embedded and Ubiquitous Computing\",\"volume\":\"206 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE 13th International Conference on Embedded and Ubiquitous Computing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EUC.2015.33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE 13th International Conference on Embedded and Ubiquitous Computing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EUC.2015.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Due to increasing demand for reconfigurability in embedded systems, real-time task scheduling is challenged by non-negligible reconfiguration overheads. We introduce the problem of real-time task scheduling under reconfiguration overhead on heterogeneous reconfigurable systems while considering the data dependencies and data communication overhead. We introduce a novel graph representation which captures the delay overhead due to data dependencies and reconfiguration. We formulate the problem as a network flow problem and provide a mixed integer linear programming solution to minimize the completion time so called makespan. Results show that our proposed scheduling improves the makespan by 24.20% (on average) in comparison with maximum-transition-overhead scheduling.