{"title":"使用虚拟化为“业务连续性的实时保证”做好数据中心准备","authors":"Rao V. Mikkilineni, Gopal Kankanhalli","doi":"10.1109/WETICE.2010.18","DOIUrl":null,"url":null,"abstract":"This paper describes our experience using the dynamic resource reallocation capabilities offered by virtualization technologies, in implementing: 1. Automation of end-to-end failover of mission critical virtualized application, a SAN network and EMC Clarion based storage to a remote site and 2. On-demand and scheduled assurance of failover and measurement of RPO and RTO (The Recovery Point Objective (RPO) is the point in time to which you must recover data as dictated by business needs. Recovery Time Objective (RTO) is the period of time after an outage in which the application and its data must be restored to a predetermined state defined by RPO.) By creating an application to spindle resource utilization profile through various management systems, and utilizing a combination of server, network- and storage-virtualization technologies, application specific RTO and RPO objectives (defined based on workload profiles and business priorities) are met in a technology agnostic and multi-vendor environment.","PeriodicalId":426248,"journal":{"name":"2010 19th IEEE International Workshops on Enabling Technologies: Infrastructures for Collaborative Enterprises","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Using Virtualization to Prepare Your Data Center for \\\"Real-Time Assurance of Business Continuity\\\"\",\"authors\":\"Rao V. Mikkilineni, Gopal Kankanhalli\",\"doi\":\"10.1109/WETICE.2010.18\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes our experience using the dynamic resource reallocation capabilities offered by virtualization technologies, in implementing: 1. Automation of end-to-end failover of mission critical virtualized application, a SAN network and EMC Clarion based storage to a remote site and 2. On-demand and scheduled assurance of failover and measurement of RPO and RTO (The Recovery Point Objective (RPO) is the point in time to which you must recover data as dictated by business needs. Recovery Time Objective (RTO) is the period of time after an outage in which the application and its data must be restored to a predetermined state defined by RPO.) By creating an application to spindle resource utilization profile through various management systems, and utilizing a combination of server, network- and storage-virtualization technologies, application specific RTO and RPO objectives (defined based on workload profiles and business priorities) are met in a technology agnostic and multi-vendor environment.\",\"PeriodicalId\":426248,\"journal\":{\"name\":\"2010 19th IEEE International Workshops on Enabling Technologies: Infrastructures for Collaborative Enterprises\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 19th IEEE International Workshops on Enabling Technologies: Infrastructures for Collaborative Enterprises\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WETICE.2010.18\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 19th IEEE International Workshops on Enabling Technologies: Infrastructures for Collaborative Enterprises","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WETICE.2010.18","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文描述了我们使用虚拟化技术提供的动态资源重新分配功能实现的经验:关键任务虚拟化应用程序、SAN网络和基于EMC Clarion的存储到远程站点的端到端故障转移自动化;按需和计划的故障转移保证以及RPO和RTO(恢复点目标(RPO))的度量是您必须根据业务需求恢复数据的时间点。恢复时间目标(RTO)是指中断后应用程序及其数据必须恢复到RPO定义的预定状态的一段时间。通过创建一个应用程序,通过各种管理系统来转移资源利用配置文件,并利用服务器、网络和存储虚拟化技术的组合,特定于应用程序的RTO和RPO目标(基于工作负载配置文件和业务优先级定义)可以在技术无关的多供应商环境中得到满足。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Using Virtualization to Prepare Your Data Center for "Real-Time Assurance of Business Continuity"
This paper describes our experience using the dynamic resource reallocation capabilities offered by virtualization technologies, in implementing: 1. Automation of end-to-end failover of mission critical virtualized application, a SAN network and EMC Clarion based storage to a remote site and 2. On-demand and scheduled assurance of failover and measurement of RPO and RTO (The Recovery Point Objective (RPO) is the point in time to which you must recover data as dictated by business needs. Recovery Time Objective (RTO) is the period of time after an outage in which the application and its data must be restored to a predetermined state defined by RPO.) By creating an application to spindle resource utilization profile through various management systems, and utilizing a combination of server, network- and storage-virtualization technologies, application specific RTO and RPO objectives (defined based on workload profiles and business priorities) are met in a technology agnostic and multi-vendor environment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信