基于ro蒙塔尼的环境影响模拟

G. Barton
{"title":"基于ro<e:1>蒙塔尼的环境影响模拟","authors":"G. Barton","doi":"10.1515/jengeo-2015-0007","DOIUrl":null,"url":null,"abstract":"Abstract One of the challenges of modern terrain modelling methods is to incorporate non-existing, planned features in the output. Remote sensing based solutions can only detect structures and shapes that are already present in the environment. In order to assess the impacts of a planned development on the surrounding landscape properly it is inevitable to solve this issue. In addition to the environmental, social and economic consequences, mining activities, especially open cast mining will also leave significant scars on the landscape. These can not only have a visual effect but also impact local weather conditions by changing winds, precipitation patterns. The current paper demonstrates a collection of methods and techniques able to cope with the various challenges that arise when modelling the landscape impacts of such developments. The experiments were performed in the area of Roşia Montană, where a Canadian company plans to create the largest open cast gold mine in Europe. The results of the terrain modelling process allow for the quantification of the estimated impacts on the terrain and the land cover of the area caused by the mining project. The presented methodology and visualisation tools can also facilitate the decision support mechanisms making the communication ‘more understandable’ amongst stakeholders; information meetings and public hearings involving organizing groups at any level. Obtaining the results required the development of several unconventional techniques especially in terrain modelling and visual landscape simulation, involving the combination of sometimes very different base methods.","PeriodicalId":115431,"journal":{"name":"Journal of Environmental Geography","volume":"179 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulating Environmental Impacts Based On The Example Of Roşia Montană\",\"authors\":\"G. Barton\",\"doi\":\"10.1515/jengeo-2015-0007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract One of the challenges of modern terrain modelling methods is to incorporate non-existing, planned features in the output. Remote sensing based solutions can only detect structures and shapes that are already present in the environment. In order to assess the impacts of a planned development on the surrounding landscape properly it is inevitable to solve this issue. In addition to the environmental, social and economic consequences, mining activities, especially open cast mining will also leave significant scars on the landscape. These can not only have a visual effect but also impact local weather conditions by changing winds, precipitation patterns. The current paper demonstrates a collection of methods and techniques able to cope with the various challenges that arise when modelling the landscape impacts of such developments. The experiments were performed in the area of Roşia Montană, where a Canadian company plans to create the largest open cast gold mine in Europe. The results of the terrain modelling process allow for the quantification of the estimated impacts on the terrain and the land cover of the area caused by the mining project. The presented methodology and visualisation tools can also facilitate the decision support mechanisms making the communication ‘more understandable’ amongst stakeholders; information meetings and public hearings involving organizing groups at any level. Obtaining the results required the development of several unconventional techniques especially in terrain modelling and visual landscape simulation, involving the combination of sometimes very different base methods.\",\"PeriodicalId\":115431,\"journal\":{\"name\":\"Journal of Environmental Geography\",\"volume\":\"179 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Environmental Geography\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/jengeo-2015-0007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Environmental Geography","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/jengeo-2015-0007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

现代地形建模方法面临的挑战之一是在输出中纳入不存在的、规划的特征。基于遥感的解决方案只能检测环境中已经存在的结构和形状。为了正确地评估规划发展对周围景观的影响,解决这个问题是不可避免的。除了环境、社会和经济后果外,采矿活动,特别是露天采矿也将在景观上留下重大的伤痕。这些不仅可以产生视觉效果,还可以通过改变风和降水模式来影响当地的天气状况。本文展示了一系列方法和技术,这些方法和技术能够应对此类开发对景观影响建模时出现的各种挑战。实验是在ro蒙塔尼地区进行的,一家加拿大公司计划在那里建立欧洲最大的露天金矿。地形模拟过程的结果可以量化采矿项目对该地区地形和土地覆盖造成的估计影响。所提出的方法和可视化工具也可以促进决策支持机制,使利益相关者之间的沟通“更容易理解”;涉及各级组织团体的信息会议和公开听证会。获得这些结果需要发展几种非常规技术,特别是在地形建模和视觉景观模拟方面,涉及有时非常不同的基础方法的组合。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulating Environmental Impacts Based On The Example Of Roşia Montană
Abstract One of the challenges of modern terrain modelling methods is to incorporate non-existing, planned features in the output. Remote sensing based solutions can only detect structures and shapes that are already present in the environment. In order to assess the impacts of a planned development on the surrounding landscape properly it is inevitable to solve this issue. In addition to the environmental, social and economic consequences, mining activities, especially open cast mining will also leave significant scars on the landscape. These can not only have a visual effect but also impact local weather conditions by changing winds, precipitation patterns. The current paper demonstrates a collection of methods and techniques able to cope with the various challenges that arise when modelling the landscape impacts of such developments. The experiments were performed in the area of Roşia Montană, where a Canadian company plans to create the largest open cast gold mine in Europe. The results of the terrain modelling process allow for the quantification of the estimated impacts on the terrain and the land cover of the area caused by the mining project. The presented methodology and visualisation tools can also facilitate the decision support mechanisms making the communication ‘more understandable’ amongst stakeholders; information meetings and public hearings involving organizing groups at any level. Obtaining the results required the development of several unconventional techniques especially in terrain modelling and visual landscape simulation, involving the combination of sometimes very different base methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信