有载分接开关存在缺陷的高压直流运行方式研究

Liu Cui, Xuehua Lin, Deyang Chen, Libin Huang, Qi Guo, Shuyong Li
{"title":"有载分接开关存在缺陷的高压直流运行方式研究","authors":"Liu Cui, Xuehua Lin, Deyang Chen, Libin Huang, Qi Guo, Shuyong Li","doi":"10.1109/HVDC50696.2020.9292817","DOIUrl":null,"url":null,"abstract":"The on-load tap changer(OLTC) is used in HVDC system to make sure the AC voltage or firing angle in an appropriate range. In recent years, after a number of onload tap-changer failures, many OLTCs of the same type were checked, and it was found that due to cracks and other conditions, the remaining action times of some still-operable OLTCs were far less than the theoretical action times. Due to production cycle and other reasons, defective components cannot be replaced in time. This requires that the DC system should be operated with a defective OLTCs. This article proposes several temporary operation measures: extend the interval between OLTC actions, adjust the OLTC control mode to Udi0, and avoid 70% voltage drop restart conditions. Using these temporary operation measures can effectively reduce the number of OLTC actions and extend its life, while ensuring the safe operation of the HVDC system. Simulation analysis proves the effectiveness of the scheme. This scheme has been implemented at the actual HVDC project site.","PeriodicalId":298807,"journal":{"name":"2020 4th International Conference on HVDC (HVDC)","volume":"732 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on the HVDC Operation Mode with Defective On-Load Tap-Changer\",\"authors\":\"Liu Cui, Xuehua Lin, Deyang Chen, Libin Huang, Qi Guo, Shuyong Li\",\"doi\":\"10.1109/HVDC50696.2020.9292817\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The on-load tap changer(OLTC) is used in HVDC system to make sure the AC voltage or firing angle in an appropriate range. In recent years, after a number of onload tap-changer failures, many OLTCs of the same type were checked, and it was found that due to cracks and other conditions, the remaining action times of some still-operable OLTCs were far less than the theoretical action times. Due to production cycle and other reasons, defective components cannot be replaced in time. This requires that the DC system should be operated with a defective OLTCs. This article proposes several temporary operation measures: extend the interval between OLTC actions, adjust the OLTC control mode to Udi0, and avoid 70% voltage drop restart conditions. Using these temporary operation measures can effectively reduce the number of OLTC actions and extend its life, while ensuring the safe operation of the HVDC system. Simulation analysis proves the effectiveness of the scheme. This scheme has been implemented at the actual HVDC project site.\",\"PeriodicalId\":298807,\"journal\":{\"name\":\"2020 4th International Conference on HVDC (HVDC)\",\"volume\":\"732 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 4th International Conference on HVDC (HVDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HVDC50696.2020.9292817\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 4th International Conference on HVDC (HVDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HVDC50696.2020.9292817","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

有载分接开关(OLTC)用于高压直流系统中,以保证交流电压或发射角在适当的范围内。近年来,在多次有载分接开关故障后,对许多同类型的oltc进行了检查,发现一些仍可运行的oltc由于裂纹等条件,其剩余动作时间远远小于理论动作时间。由于生产周期等原因,有缺陷的部件不能及时更换。这要求直流系统应与有缺陷的oltc一起运行。提出了延长OLTC动作间隔时间、调整OLTC控制方式为Udi0、避免70%电压降重启等临时运行措施。采用这些临时运行措施可以有效地减少OLTC动作次数,延长其使用寿命,同时保证高压直流系统的安全运行。仿真分析证明了该方案的有效性。该方案已在实际高压直流工程现场实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on the HVDC Operation Mode with Defective On-Load Tap-Changer
The on-load tap changer(OLTC) is used in HVDC system to make sure the AC voltage or firing angle in an appropriate range. In recent years, after a number of onload tap-changer failures, many OLTCs of the same type were checked, and it was found that due to cracks and other conditions, the remaining action times of some still-operable OLTCs were far less than the theoretical action times. Due to production cycle and other reasons, defective components cannot be replaced in time. This requires that the DC system should be operated with a defective OLTCs. This article proposes several temporary operation measures: extend the interval between OLTC actions, adjust the OLTC control mode to Udi0, and avoid 70% voltage drop restart conditions. Using these temporary operation measures can effectively reduce the number of OLTC actions and extend its life, while ensuring the safe operation of the HVDC system. Simulation analysis proves the effectiveness of the scheme. This scheme has been implemented at the actual HVDC project site.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信