{"title":"基于遗传算法的机械故障干扰柔性作业车间重调度问题","authors":"Zhongyuan Liang, Peisi Zhong, Chao Zhang, Wenlei Yang, Wei Xiong, Shihao Yang, Jing Meng","doi":"10.17531/ein/171784","DOIUrl":null,"url":null,"abstract":"Rescheduling is the guarantee to maintain the reliable operation of production system process. In production system, the original scheduling scheme cannot be carried out when machine breaks down. It is necessary to transfer the production tasks in the failure cycle and replan the production path to ensure that the production tasks are completed on time and maintain the stability of production system. To address this issue, in this paper, we studied the event-driven rescheduling policy in dynamic environment, and established the usage rules of right-shift rescheduling and complete rescheduling based on the type of interference events. And then, we proposed the rescheduling decision method based on genetic algorithm for solving flexible job shop scheduling problem with machine fault inter-ference. In addition, we extended the \"mk\" series of instances by introducing the machine fault interference information. The solution data show that the complete rescheduling method can respond effectively to the rescheduling of flexible job shop scheduling problem with machine failure interference.","PeriodicalId":335030,"journal":{"name":"Eksploatacja i Niezawodność – Maintenance and Reliability","volume":"198 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A genetic algorithm-based approach for flexible job shop rescheduling problem with machine failure interference\",\"authors\":\"Zhongyuan Liang, Peisi Zhong, Chao Zhang, Wenlei Yang, Wei Xiong, Shihao Yang, Jing Meng\",\"doi\":\"10.17531/ein/171784\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Rescheduling is the guarantee to maintain the reliable operation of production system process. In production system, the original scheduling scheme cannot be carried out when machine breaks down. It is necessary to transfer the production tasks in the failure cycle and replan the production path to ensure that the production tasks are completed on time and maintain the stability of production system. To address this issue, in this paper, we studied the event-driven rescheduling policy in dynamic environment, and established the usage rules of right-shift rescheduling and complete rescheduling based on the type of interference events. And then, we proposed the rescheduling decision method based on genetic algorithm for solving flexible job shop scheduling problem with machine fault inter-ference. In addition, we extended the \\\"mk\\\" series of instances by introducing the machine fault interference information. The solution data show that the complete rescheduling method can respond effectively to the rescheduling of flexible job shop scheduling problem with machine failure interference.\",\"PeriodicalId\":335030,\"journal\":{\"name\":\"Eksploatacja i Niezawodność – Maintenance and Reliability\",\"volume\":\"198 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eksploatacja i Niezawodność – Maintenance and Reliability\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17531/ein/171784\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eksploatacja i Niezawodność – Maintenance and Reliability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17531/ein/171784","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A genetic algorithm-based approach for flexible job shop rescheduling problem with machine failure interference
Rescheduling is the guarantee to maintain the reliable operation of production system process. In production system, the original scheduling scheme cannot be carried out when machine breaks down. It is necessary to transfer the production tasks in the failure cycle and replan the production path to ensure that the production tasks are completed on time and maintain the stability of production system. To address this issue, in this paper, we studied the event-driven rescheduling policy in dynamic environment, and established the usage rules of right-shift rescheduling and complete rescheduling based on the type of interference events. And then, we proposed the rescheduling decision method based on genetic algorithm for solving flexible job shop scheduling problem with machine fault inter-ference. In addition, we extended the "mk" series of instances by introducing the machine fault interference information. The solution data show that the complete rescheduling method can respond effectively to the rescheduling of flexible job shop scheduling problem with machine failure interference.