用精益和BIM改进设计协调,一个印度案例研究

Vaibhav Bhat, Jyoti Trivedi, Bhargav Dave
{"title":"用精益和BIM改进设计协调,一个印度案例研究","authors":"Vaibhav Bhat, Jyoti Trivedi, Bhargav Dave","doi":"10.24928/2018/0479","DOIUrl":null,"url":null,"abstract":"Building Information Modeling (BIM) and Lean construction principles have been used independently as significant methods to construction process improvement. Their combination presents challenges and opportunities in implementation, especially when applied in the field. This study explores two perspectives, firstly identifying factors and issues in design coordination of construction projects; secondly, applying lean and BIM functions simultaneously to overcome some of the problems in design coordination. Relative Importance Index (RII) method was adopted to identify major critical factors of design coordination and their effect on the three categories viz; design management, time management and cost management. Subsequently, BIM and lean functions such as 4D simulation integrated with Look ahead planning, Quantity take off, Clash detection during look-ahead and weekly work planning, to reduce change orders and RFIs for additional value to customer were applied in an integrated fashion. This improvised BIMLean process facilitates the design co-ordination during construction phase for all project stakeholders. Finally a matrix is drafted based on previous research that shows integration of Lean Principles and BIM functionalities adopted for the case study.","PeriodicalId":419313,"journal":{"name":"26th Annual Conference of the International Group for Lean Construction","volume":"123 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Improving Design Coordination With Lean and BIM, an Indian Case Study\",\"authors\":\"Vaibhav Bhat, Jyoti Trivedi, Bhargav Dave\",\"doi\":\"10.24928/2018/0479\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Building Information Modeling (BIM) and Lean construction principles have been used independently as significant methods to construction process improvement. Their combination presents challenges and opportunities in implementation, especially when applied in the field. This study explores two perspectives, firstly identifying factors and issues in design coordination of construction projects; secondly, applying lean and BIM functions simultaneously to overcome some of the problems in design coordination. Relative Importance Index (RII) method was adopted to identify major critical factors of design coordination and their effect on the three categories viz; design management, time management and cost management. Subsequently, BIM and lean functions such as 4D simulation integrated with Look ahead planning, Quantity take off, Clash detection during look-ahead and weekly work planning, to reduce change orders and RFIs for additional value to customer were applied in an integrated fashion. This improvised BIMLean process facilitates the design co-ordination during construction phase for all project stakeholders. Finally a matrix is drafted based on previous research that shows integration of Lean Principles and BIM functionalities adopted for the case study.\",\"PeriodicalId\":419313,\"journal\":{\"name\":\"26th Annual Conference of the International Group for Lean Construction\",\"volume\":\"123 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"26th Annual Conference of the International Group for Lean Construction\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24928/2018/0479\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"26th Annual Conference of the International Group for Lean Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24928/2018/0479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

建筑信息模型(BIM)和精益施工原则已经分别作为施工过程改进的重要方法。它们的结合在执行方面带来了挑战和机遇,特别是在实地应用时。本研究从两个角度进行探讨,一是找出建设项目设计协调中的因素与问题;其次,同时运用精益和BIM的功能,克服设计协调中的一些问题。采用相对重要性指数法(Relative Importance Index, RII)识别设计协调的主要关键因素及其对三类设计协调的影响;设计管理、时间管理和成本管理。随后,BIM和精益功能,如与预检计划集成的4D模拟,数量起飞,预检期间的冲突检测和每周工作计划,以集成的方式应用于减少变更订单和rfi,为客户带来附加价值。这种即兴的BIMLean流程促进了所有项目利益相关者在施工阶段的设计协调。最后,根据先前的研究起草了一个矩阵,该矩阵显示了案例研究中采用的精益原则和BIM功能的集成。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving Design Coordination With Lean and BIM, an Indian Case Study
Building Information Modeling (BIM) and Lean construction principles have been used independently as significant methods to construction process improvement. Their combination presents challenges and opportunities in implementation, especially when applied in the field. This study explores two perspectives, firstly identifying factors and issues in design coordination of construction projects; secondly, applying lean and BIM functions simultaneously to overcome some of the problems in design coordination. Relative Importance Index (RII) method was adopted to identify major critical factors of design coordination and their effect on the three categories viz; design management, time management and cost management. Subsequently, BIM and lean functions such as 4D simulation integrated with Look ahead planning, Quantity take off, Clash detection during look-ahead and weekly work planning, to reduce change orders and RFIs for additional value to customer were applied in an integrated fashion. This improvised BIMLean process facilitates the design co-ordination during construction phase for all project stakeholders. Finally a matrix is drafted based on previous research that shows integration of Lean Principles and BIM functionalities adopted for the case study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信