{"title":"复杂ETO公司工程变更管理的分类","authors":"E. Arica, Ottar Bakaas, P. Sriram","doi":"10.1109/IEEM45057.2020.9309966","DOIUrl":null,"url":null,"abstract":"In this paper, we study a specific type of Engineer-to-Order (ETO) firms called Complex ETO characterized by one-of-a-kind products with high complexity and low volumes. Such firms are at high risk of encountering significant engineering changes due to their characteristics. The management of engineering changes have a large impact of time, cost, and quality of the project. The purpose of this paper is therefore to provide a holistic taxonomy for Engineering Change Management (ECM) that can guide the companies with set of actions to prevent, handle, and manage engineering changes. The study is based on literature and empirical findings from a single case study conducted in an offshore platform producer, which resulted in development and verification of the taxonomy.","PeriodicalId":226426,"journal":{"name":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-12-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Taxonomy for Engineering Change Management in Complex ETO Firms\",\"authors\":\"E. Arica, Ottar Bakaas, P. Sriram\",\"doi\":\"10.1109/IEEM45057.2020.9309966\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we study a specific type of Engineer-to-Order (ETO) firms called Complex ETO characterized by one-of-a-kind products with high complexity and low volumes. Such firms are at high risk of encountering significant engineering changes due to their characteristics. The management of engineering changes have a large impact of time, cost, and quality of the project. The purpose of this paper is therefore to provide a holistic taxonomy for Engineering Change Management (ECM) that can guide the companies with set of actions to prevent, handle, and manage engineering changes. The study is based on literature and empirical findings from a single case study conducted in an offshore platform producer, which resulted in development and verification of the taxonomy.\",\"PeriodicalId\":226426,\"journal\":{\"name\":\"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM45057.2020.9309966\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM45057.2020.9309966","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文研究了一种特殊类型的ETO (Engineer-to-Order)企业,即复杂ETO,其特征是产品具有高复杂性和小批量。由于这些公司的特点,它们面临着重大工程变更的高风险。工程变更的管理对工程的时间、成本和质量都有很大的影响。因此,本文的目的是为工程变更管理(ECM)提供一个全面的分类,它可以指导公司采取一系列行动来预防、处理和管理工程变更。该研究基于对海上平台生产商进行的单一案例研究的文献和实证结果,从而开发和验证了分类。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Taxonomy for Engineering Change Management in Complex ETO Firms
In this paper, we study a specific type of Engineer-to-Order (ETO) firms called Complex ETO characterized by one-of-a-kind products with high complexity and low volumes. Such firms are at high risk of encountering significant engineering changes due to their characteristics. The management of engineering changes have a large impact of time, cost, and quality of the project. The purpose of this paper is therefore to provide a holistic taxonomy for Engineering Change Management (ECM) that can guide the companies with set of actions to prevent, handle, and manage engineering changes. The study is based on literature and empirical findings from a single case study conducted in an offshore platform producer, which resulted in development and verification of the taxonomy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信