G. R. Adhikari, A. I. Theresraj, R. Balachander, R.N. Gupta, B. vasava
{"title":"萨尔萨尔萨尔河工程后水管隧道混凝土塞的控制爆破拆除","authors":"G. R. Adhikari, A. I. Theresraj, R. Balachander, R.N. Gupta, B. vasava","doi":"10.1201/9781003078739-43","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":110642,"journal":{"name":"Tunnelling Asia’2000","volume":"175 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Controlled Blasting for Removal of Concrete Plugs in Draft Tube Tunnels at Sard AR Sarovar Project\",\"authors\":\"G. R. Adhikari, A. I. Theresraj, R. Balachander, R.N. Gupta, B. vasava\",\"doi\":\"10.1201/9781003078739-43\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":110642,\"journal\":{\"name\":\"Tunnelling Asia’2000\",\"volume\":\"175 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tunnelling Asia’2000\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/9781003078739-43\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tunnelling Asia’2000","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003078739-43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}