根据动力设备参数监测系统数据对TPP汽轮机凝汽器技术状态进行了评定

M. Sultanov, I. Boldyrev, P. D. Menshikov, Nikolay Chumakov
{"title":"根据动力设备参数监测系统数据对TPP汽轮机凝汽器技术状态进行了评定","authors":"M. Sultanov, I. Boldyrev, P. D. Menshikov, Nikolay Chumakov","doi":"10.1109/REEPE51337.2021.9388084","DOIUrl":null,"url":null,"abstract":"The article presents method of estimating the current technical condition of condensers of steam turbines of TPP by several indicators, the change of which in aggregate indicates the presence of a defect in the condenser stack. Failure of the condensing unit results in forced turbine downtime. In terms of failure frequency, condensing plants are in leading positions, relative to the rest of the heat exchange equipment. The main causes of the condensing plant failures include the untimely replacement of the condenser pipes. The use of this method can allow you to switch from the system of planned preventive repairs to repair according to the current technical condition.","PeriodicalId":272476,"journal":{"name":"2021 3rd International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of technical condition of condensers of TPP steam turbines according to the data of the power equipment parameters monitoring system\",\"authors\":\"M. Sultanov, I. Boldyrev, P. D. Menshikov, Nikolay Chumakov\",\"doi\":\"10.1109/REEPE51337.2021.9388084\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article presents method of estimating the current technical condition of condensers of steam turbines of TPP by several indicators, the change of which in aggregate indicates the presence of a defect in the condenser stack. Failure of the condensing unit results in forced turbine downtime. In terms of failure frequency, condensing plants are in leading positions, relative to the rest of the heat exchange equipment. The main causes of the condensing plant failures include the untimely replacement of the condenser pipes. The use of this method can allow you to switch from the system of planned preventive repairs to repair according to the current technical condition.\",\"PeriodicalId\":272476,\"journal\":{\"name\":\"2021 3rd International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-03-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 3rd International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/REEPE51337.2021.9388084\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 3rd International Youth Conference on Radio Electronics, Electrical and Power Engineering (REEPE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REEPE51337.2021.9388084","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出了用几个指标来估计跨太平洋汽轮机冷凝器目前技术状况的方法,这些指标的变化总体上表明冷凝器堆存在缺陷。冷凝机组的故障导致涡轮机被迫停机。就故障频率而言,相对于其他热交换设备,冷凝装置处于领先地位。凝汽装置故障的主要原因包括凝汽器管道的更换不及时。使用这种方法可以使您从计划预防性维修系统切换到根据当前技术条件进行维修。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of technical condition of condensers of TPP steam turbines according to the data of the power equipment parameters monitoring system
The article presents method of estimating the current technical condition of condensers of steam turbines of TPP by several indicators, the change of which in aggregate indicates the presence of a defect in the condenser stack. Failure of the condensing unit results in forced turbine downtime. In terms of failure frequency, condensing plants are in leading positions, relative to the rest of the heat exchange equipment. The main causes of the condensing plant failures include the untimely replacement of the condenser pipes. The use of this method can allow you to switch from the system of planned preventive repairs to repair according to the current technical condition.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信