优化软件质量保证

O. Alshathry, H. Janicke
{"title":"优化软件质量保证","authors":"O. Alshathry, H. Janicke","doi":"10.1109/COMPSACW.2010.25","DOIUrl":null,"url":null,"abstract":"A major concern for managers of software projects are the triple constraints of cost, schedule and quality due to the difficulties to quantify accurately the trade-offs between them. Project managers working for accredited companies with a high maturity will typically use software cost estimation models like COCOMO II and predict software quality by the estimated number of defects the product is likely to contain at release. However, most of these models are used separately and the interplay between cost/effort estimation, project scheduling and the resultant quality of the software product is not well understood. In this paper, we propose a regression-based model that allows project managers to estimate the trade-off between the quality, cost and development time of a software product, based on previously collected data.","PeriodicalId":121135,"journal":{"name":"2010 IEEE 34th Annual Computer Software and Applications Conference Workshops","volume":"82 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Optimizing Software Quality Assurance\",\"authors\":\"O. Alshathry, H. Janicke\",\"doi\":\"10.1109/COMPSACW.2010.25\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A major concern for managers of software projects are the triple constraints of cost, schedule and quality due to the difficulties to quantify accurately the trade-offs between them. Project managers working for accredited companies with a high maturity will typically use software cost estimation models like COCOMO II and predict software quality by the estimated number of defects the product is likely to contain at release. However, most of these models are used separately and the interplay between cost/effort estimation, project scheduling and the resultant quality of the software product is not well understood. In this paper, we propose a regression-based model that allows project managers to estimate the trade-off between the quality, cost and development time of a software product, based on previously collected data.\",\"PeriodicalId\":121135,\"journal\":{\"name\":\"2010 IEEE 34th Annual Computer Software and Applications Conference Workshops\",\"volume\":\"82 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-07-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE 34th Annual Computer Software and Applications Conference Workshops\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/COMPSACW.2010.25\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE 34th Annual Computer Software and Applications Conference Workshops","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/COMPSACW.2010.25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

软件项目管理人员主要关注的是成本、进度和质量的三重约束,因为很难准确地量化它们之间的权衡。为具有高成熟度的认证公司工作的项目经理通常会使用像COCOMO II这样的软件成本估算模型,并通过估计产品在发布时可能包含的缺陷数量来预测软件质量。然而,这些模型中的大多数是单独使用的,并且成本/工作量估算、项目调度和软件产品的最终质量之间的相互作用并没有得到很好的理解。在本文中,我们提出了一个基于回归的模型,该模型允许项目经理基于先前收集的数据来估计软件产品的质量、成本和开发时间之间的权衡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing Software Quality Assurance
A major concern for managers of software projects are the triple constraints of cost, schedule and quality due to the difficulties to quantify accurately the trade-offs between them. Project managers working for accredited companies with a high maturity will typically use software cost estimation models like COCOMO II and predict software quality by the estimated number of defects the product is likely to contain at release. However, most of these models are used separately and the interplay between cost/effort estimation, project scheduling and the resultant quality of the software product is not well understood. In this paper, we propose a regression-based model that allows project managers to estimate the trade-off between the quality, cost and development time of a software product, based on previously collected data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信