埃塞俄比亚西奥罗米亚地区公共建筑工程造价估算准确性影响因素评估

Jifara Chimdi, Sisay Girma, Alemu Mosisa, Degefe Mitiku
{"title":"埃塞俄比亚西奥罗米亚地区公共建筑工程造价估算准确性影响因素评估","authors":"Jifara Chimdi, Sisay Girma, Alemu Mosisa, Degefe Mitiku","doi":"10.33736/jcest.2617.2020","DOIUrl":null,"url":null,"abstract":"Construction projects are getting progressively complex and their scales are getting sophisticated. Along these lines, it is getting more problematic to finish the projects inside planned cost limits. In Oromia public building construction projects these problems were raised as a typical challenge. Hence, evaluation of factors affecting the accuracy of cost estimation in public projects was the aim of this study. Both quantitative and qualitative methods were utilized for information assortment. Relative Importance Index (RII) was utilized for information investigation. Totally sixty -two variables were investigated and the best five most significant were selected by this assessment based on the average view of respondents. These significant factors are; Material price/accessibility /source /quality /imports, Experience and ability of the consultant, Variability in the Economy of the country, and financial conditions of client.  Spearman's rank correlation coefficients (rho) investigation was conducted by the assistance of SPSS 20 version for a testing level of connections among respondents on the positioning of the factors affecting the accuracy of cost estimation. Spearman’s rank correlation results were 0.823 among Clients and Consultants, 0.813 among clients and contractors, and 0.802 among Consultants and Contractors. The outcome shows that the rate of the rank correlations was a high positive number, which implies there is a positive connection between them on the ranking of factors disturbing the accurateness of cost estimation in public building construction projects in western Oromia.","PeriodicalId":346729,"journal":{"name":"Journal of Civil Engineering, Science and Technology","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"ASSESSMENT OF FACTORS AFFECTING ACCURACY OF COST ESTIMATION IN PUBLIC BUILDING CONSTRUCTION PROJECTS IN WESTERN OROMIA REGION, ETHIOPIA\",\"authors\":\"Jifara Chimdi, Sisay Girma, Alemu Mosisa, Degefe Mitiku\",\"doi\":\"10.33736/jcest.2617.2020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction projects are getting progressively complex and their scales are getting sophisticated. Along these lines, it is getting more problematic to finish the projects inside planned cost limits. In Oromia public building construction projects these problems were raised as a typical challenge. Hence, evaluation of factors affecting the accuracy of cost estimation in public projects was the aim of this study. Both quantitative and qualitative methods were utilized for information assortment. Relative Importance Index (RII) was utilized for information investigation. Totally sixty -two variables were investigated and the best five most significant were selected by this assessment based on the average view of respondents. These significant factors are; Material price/accessibility /source /quality /imports, Experience and ability of the consultant, Variability in the Economy of the country, and financial conditions of client.  Spearman's rank correlation coefficients (rho) investigation was conducted by the assistance of SPSS 20 version for a testing level of connections among respondents on the positioning of the factors affecting the accuracy of cost estimation. Spearman’s rank correlation results were 0.823 among Clients and Consultants, 0.813 among clients and contractors, and 0.802 among Consultants and Contractors. The outcome shows that the rate of the rank correlations was a high positive number, which implies there is a positive connection between them on the ranking of factors disturbing the accurateness of cost estimation in public building construction projects in western Oromia.\",\"PeriodicalId\":346729,\"journal\":{\"name\":\"Journal of Civil Engineering, Science and Technology\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Civil Engineering, Science and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33736/jcest.2617.2020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering, Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33736/jcest.2617.2020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

建设项目越来越复杂,规模也越来越复杂。沿着这些路线,在计划成本限制内完成项目变得越来越困难。在奥罗米亚州的公共建筑建设项目中,这些问题被作为一个典型的挑战提出。因此,评估影响公共项目成本估算准确性的因素是本研究的目的。采用定量和定性相结合的方法进行信息分类。采用相对重要性指数(Relative Importance Index, RII)进行信息调查。总共调查了62个变量,并根据受访者的平均观点选择了最好的五个最显著的评估。这些重要因素是;材料价格/可及性/来源/质量/进口、顾问的经验和能力、国家经济的可变性以及客户的财务状况。Spearman的秩相关系数(rho)调查是借助SPSS 20版本进行的,用于测试受访者之间对影响成本估算准确性的因素定位的联系程度。Spearman的等级相关结果在客户与顾问之间为0.823,在客户与承包商之间为0.813,在顾问与承包商之间为0.802。结果表明,秩相关率为一个较高的正数,这表明秩相关率与影响西奥罗米亚公共建筑建设项目成本估算准确性的因素排序之间存在正相关。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ASSESSMENT OF FACTORS AFFECTING ACCURACY OF COST ESTIMATION IN PUBLIC BUILDING CONSTRUCTION PROJECTS IN WESTERN OROMIA REGION, ETHIOPIA
Construction projects are getting progressively complex and their scales are getting sophisticated. Along these lines, it is getting more problematic to finish the projects inside planned cost limits. In Oromia public building construction projects these problems were raised as a typical challenge. Hence, evaluation of factors affecting the accuracy of cost estimation in public projects was the aim of this study. Both quantitative and qualitative methods were utilized for information assortment. Relative Importance Index (RII) was utilized for information investigation. Totally sixty -two variables were investigated and the best five most significant were selected by this assessment based on the average view of respondents. These significant factors are; Material price/accessibility /source /quality /imports, Experience and ability of the consultant, Variability in the Economy of the country, and financial conditions of client.  Spearman's rank correlation coefficients (rho) investigation was conducted by the assistance of SPSS 20 version for a testing level of connections among respondents on the positioning of the factors affecting the accuracy of cost estimation. Spearman’s rank correlation results were 0.823 among Clients and Consultants, 0.813 among clients and contractors, and 0.802 among Consultants and Contractors. The outcome shows that the rate of the rank correlations was a high positive number, which implies there is a positive connection between them on the ranking of factors disturbing the accurateness of cost estimation in public building construction projects in western Oromia.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信