建立风险项目的选择与调度模型

J. Sefair, A. Medaglia
{"title":"建立风险项目的选择与调度模型","authors":"J. Sefair, A. Medaglia","doi":"10.1109/SIEDS.2005.193252","DOIUrl":null,"url":null,"abstract":"The planning process of public and private companies relies on optimal project selection and scheduling and the efficient allocation of scarce resources. This process is complicated due in part to the fact that project investment must consider multiple criteria, project cash flows are uncertain, and there are several operational business and technical constraints. The proposed mixed-integer programming model assists the planning manager/analyst by choosing from a bank of projects in which projects to invest and when to invest. The model maximizes the sum of net present values of the chosen projects while minimizing their variance. The model satisfies simultaneously a set of precedence relations among projects; early and tardy project starting dates; exogenous budget limits; and endogenous project cash flow generation. Finally, by quantifying the opportunity cost the model shows how arbitrary project selection and sequencing can reflect non-desirable solutions for the company and the society.","PeriodicalId":317634,"journal":{"name":"2005 IEEE Design Symposium, Systems and Information Engineering","volume":"190 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"24","resultStr":"{\"title\":\"Towards a model for selection and scheduling of risky projects\",\"authors\":\"J. Sefair, A. Medaglia\",\"doi\":\"10.1109/SIEDS.2005.193252\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The planning process of public and private companies relies on optimal project selection and scheduling and the efficient allocation of scarce resources. This process is complicated due in part to the fact that project investment must consider multiple criteria, project cash flows are uncertain, and there are several operational business and technical constraints. The proposed mixed-integer programming model assists the planning manager/analyst by choosing from a bank of projects in which projects to invest and when to invest. The model maximizes the sum of net present values of the chosen projects while minimizing their variance. The model satisfies simultaneously a set of precedence relations among projects; early and tardy project starting dates; exogenous budget limits; and endogenous project cash flow generation. Finally, by quantifying the opportunity cost the model shows how arbitrary project selection and sequencing can reflect non-desirable solutions for the company and the society.\",\"PeriodicalId\":317634,\"journal\":{\"name\":\"2005 IEEE Design Symposium, Systems and Information Engineering\",\"volume\":\"190 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"24\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 IEEE Design Symposium, Systems and Information Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIEDS.2005.193252\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 IEEE Design Symposium, Systems and Information Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIEDS.2005.193252","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 24

摘要

公共和私营公司的规划过程依赖于最优的项目选择和调度以及稀缺资源的有效配置。这个过程是复杂的,部分原因是项目投资必须考虑多个标准,项目现金流是不确定的,并且有几个操作业务和技术限制。提出的混合整数规划模型通过从项目库中选择投资哪些项目以及何时投资来帮助规划经理/分析师。该模型使所选项目的净现值总和最大化,同时使其方差最小化。该模型同时满足一组项目间的优先关系;项目开始日期早或晚;外生预算限制;以及内生项目现金流的产生。最后,通过量化机会成本,该模型显示了任意的项目选择和排序如何反映公司和社会不理想的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Towards a model for selection and scheduling of risky projects
The planning process of public and private companies relies on optimal project selection and scheduling and the efficient allocation of scarce resources. This process is complicated due in part to the fact that project investment must consider multiple criteria, project cash flows are uncertain, and there are several operational business and technical constraints. The proposed mixed-integer programming model assists the planning manager/analyst by choosing from a bank of projects in which projects to invest and when to invest. The model maximizes the sum of net present values of the chosen projects while minimizing their variance. The model satisfies simultaneously a set of precedence relations among projects; early and tardy project starting dates; exogenous budget limits; and endogenous project cash flow generation. Finally, by quantifying the opportunity cost the model shows how arbitrary project selection and sequencing can reflect non-desirable solutions for the company and the society.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信