Arfiani Nur Khusna, Fahmi Ardhi Nugraha
{"title":"Sistem Informasi Stok Gudang Koperasi Menggunakan Supply Chain Management","authors":"Arfiani Nur Khusna, Fahmi Ardhi Nugraha","doi":"10.21456/VOL8ISS2PP203-210","DOIUrl":null,"url":null,"abstract":"The cooperative is faced with the problem of how to keep the availability of goods in the warehouse sufficient, not experiencing upperstock or understock in the stock inventory system. The Supply Chain Management approach can help overcome the problem of availability of goods by integrating suppliers efficiently. The study aims to produce information about the stock of goods and the number of orders for the next period so that it can make a suitable budget plan. Collecting data is the first step and then designing the pattern of supply chain management flow, supply chain management strategies include the use of pareto ABC classification to give priority to supervision of inventory and determination of purchase points by calculating Economy Order Quantity (EOQ), process flow, implementation and testing. The system produces goods stock information that is able to provide accurate information about the remaining stock of goods in the warehouse along with calculation calculations for the purchase of each item at an economical price and amount, for the determination of product reorder time (Reorder Point), the average product lead time is 2 days, the usage rate per day for rice is 0.34 and the safety stock of rice is 20 sacks so that if the rice has reached the 3 point sack then the cooperative must re-order. The test results using usability test showed that 66.66% of the questions were able to be answered by the respondents and the test results between 65-84% were declared good so that the application was feasible and usable.","PeriodicalId":123899,"journal":{"name":"Jurnal Sistem Informasi Bisnis","volume":"128 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Sistem Informasi Bisnis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21456/VOL8ISS2PP203-210","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

合作社面临的问题是如何在库存系统中保持充足的库存,而不出现库存过剩或库存不足的情况。供应链管理方法可以通过有效地整合供应商来帮助克服商品的可用性问题。该研究的目的是产生关于商品的库存和订单的数量为下一个时期的信息,以便它可以做出一个合适的预算计划。收集数据是第一步,然后设计供应链管理流程模式,供应链管理策略包括使用pareto ABC分类法优先监督库存,通过计算经济订货量(EOQ)确定采购点,流程,实施和测试。系统产生的商品库存信息,能够提供准确的仓库剩余库存信息,并计算出以经济的价格和数量购买每件商品的计算,确定产品再订货时间(reorder Point),平均产品交货时间为2天;每天大米的使用率为0.34,大米的安全库存为20袋,因此,如果大米达到3分袋,合作社必须重新订购。使用可用性测试的测试结果表明,66.66%的问题能够被受访者回答,65-84%的测试结果被认为是好的,因此应用程序是可行的和可用的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sistem Informasi Stok Gudang Koperasi Menggunakan Supply Chain Management
The cooperative is faced with the problem of how to keep the availability of goods in the warehouse sufficient, not experiencing upperstock or understock in the stock inventory system. The Supply Chain Management approach can help overcome the problem of availability of goods by integrating suppliers efficiently. The study aims to produce information about the stock of goods and the number of orders for the next period so that it can make a suitable budget plan. Collecting data is the first step and then designing the pattern of supply chain management flow, supply chain management strategies include the use of pareto ABC classification to give priority to supervision of inventory and determination of purchase points by calculating Economy Order Quantity (EOQ), process flow, implementation and testing. The system produces goods stock information that is able to provide accurate information about the remaining stock of goods in the warehouse along with calculation calculations for the purchase of each item at an economical price and amount, for the determination of product reorder time (Reorder Point), the average product lead time is 2 days, the usage rate per day for rice is 0.34 and the safety stock of rice is 20 sacks so that if the rice has reached the 3 point sack then the cooperative must re-order. The test results using usability test showed that 66.66% of the questions were able to be answered by the respondents and the test results between 65-84% were declared good so that the application was feasible and usable.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信