基于建筑信息模型的建筑工程造价估算计算

Muhamad Yusuf Mahendra, Nia Kartika, Tahadjuddin
{"title":"基于建筑信息模型的建筑工程造价估算计算","authors":"Muhamad Yusuf Mahendra, Nia Kartika, Tahadjuddin","doi":"10.23887/ijnse.v7i1.57640","DOIUrl":null,"url":null,"abstract":"BIM (Building Information Modeling) is currently a concept that can include important information in planning. This study aims Kosmetika Global Helath Indonesia, Ejip Area, Cikarang. In this research, 3D modeling of steel structures was carried out based on shop drawing documents from the research location. Next, calculate the quantity take-off for the estimated cost of steel structure work using Autodesk Revit software. It can be concluded that using Auusingit software can optimize the 2D modeling process into the 3D form so that the quantity take-off calculations can be more detailed and accurate and reduce material waste. It also already supports BIM 5D to help calculate estimated costs. The results of calculating estimated costs using Autodesk Revit software are 3.45% smaller than conventional calculations. It is because conventional methods are calculated manually based on 2D images, which allow for differences due to lack of detail.","PeriodicalId":181108,"journal":{"name":"International Journal of Natural Science and Engineering","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Calculation of Cost Estimation Based on Building Information Modeling in Construction Projects\",\"authors\":\"Muhamad Yusuf Mahendra, Nia Kartika, Tahadjuddin\",\"doi\":\"10.23887/ijnse.v7i1.57640\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"BIM (Building Information Modeling) is currently a concept that can include important information in planning. This study aims Kosmetika Global Helath Indonesia, Ejip Area, Cikarang. In this research, 3D modeling of steel structures was carried out based on shop drawing documents from the research location. Next, calculate the quantity take-off for the estimated cost of steel structure work using Autodesk Revit software. It can be concluded that using Auusingit software can optimize the 2D modeling process into the 3D form so that the quantity take-off calculations can be more detailed and accurate and reduce material waste. It also already supports BIM 5D to help calculate estimated costs. The results of calculating estimated costs using Autodesk Revit software are 3.45% smaller than conventional calculations. It is because conventional methods are calculated manually based on 2D images, which allow for differences due to lack of detail.\",\"PeriodicalId\":181108,\"journal\":{\"name\":\"International Journal of Natural Science and Engineering\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Natural Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23887/ijnse.v7i1.57640\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Natural Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23887/ijnse.v7i1.57640","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

BIM(建筑信息模型)目前是一个概念,可以在规划中包含重要的信息。本研究的对象是印尼的Kosmetika Global health,位于Cikarang的Ejip地区。在本研究中,基于研究地点的车间图纸文件,对钢结构进行了三维建模。其次,使用Autodesk Revit软件计算钢结构工程估算成本的数量起飞。可以得出结论,使用Auusingit软件可以将二维建模过程优化为三维形式,从而使数量起飞计算更加详细和准确,减少材料浪费。它也已经支持BIM 5D来帮助计算估计成本。使用Autodesk Revit软件计算估计成本的结果比传统计算小3.45%。这是因为传统的方法是基于二维图像手动计算的,这允许由于缺乏细节而产生的差异。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Calculation of Cost Estimation Based on Building Information Modeling in Construction Projects
BIM (Building Information Modeling) is currently a concept that can include important information in planning. This study aims Kosmetika Global Helath Indonesia, Ejip Area, Cikarang. In this research, 3D modeling of steel structures was carried out based on shop drawing documents from the research location. Next, calculate the quantity take-off for the estimated cost of steel structure work using Autodesk Revit software. It can be concluded that using Auusingit software can optimize the 2D modeling process into the 3D form so that the quantity take-off calculations can be more detailed and accurate and reduce material waste. It also already supports BIM 5D to help calculate estimated costs. The results of calculating estimated costs using Autodesk Revit software are 3.45% smaller than conventional calculations. It is because conventional methods are calculated manually based on 2D images, which allow for differences due to lack of detail.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信