Liu Yuan, Jian-zhong Zhou, Chuyang Chang, Peng Lu, Chao Wang, Muhammad Tayyab
{"title":"梯级水电站日负荷曲线短期联合优化","authors":"Liu Yuan, Jian-zhong Zhou, Chuyang Chang, Peng Lu, Chao Wang, Muhammad Tayyab","doi":"10.1109/ICKEA.2016.7803026","DOIUrl":null,"url":null,"abstract":"Short-term operation of hydropower stations is a vital part of power grid scheduling. In order to ensure security and stability of power grid, it is of great importance for stations to operate according to the power grid instructions. Yet as far as stations concerned, they'd like to run as an economical way so that the maximal benefit is reaped. To satisfy the demand of power system and optimize the operation of cascade hydropower stations at the same time, a daily joint optimization model of cascade hydropower stations is established, considering the daily power load curve and power generation of a single station. Then a heuristic hierarchic optimization (HHO) strategy is proposed to solve the model. The total hydroenergy consumption of single and joint operation of cascade hydropower stations of Qingjiang River is calculated. The results make clear that comparing with single operation, the hydroenergy consumption of joint operation is less, which is of great significance to cascade hydropower stations. The modeling and solution can be good references to cascade hydropower stations dispatched by the same power grid.","PeriodicalId":241850,"journal":{"name":"2016 IEEE International Conference on Knowledge Engineering and Applications (ICKEA)","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Short-term joint optimization of cascade hydropower stations on daily power load curve\",\"authors\":\"Liu Yuan, Jian-zhong Zhou, Chuyang Chang, Peng Lu, Chao Wang, Muhammad Tayyab\",\"doi\":\"10.1109/ICKEA.2016.7803026\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Short-term operation of hydropower stations is a vital part of power grid scheduling. In order to ensure security and stability of power grid, it is of great importance for stations to operate according to the power grid instructions. Yet as far as stations concerned, they'd like to run as an economical way so that the maximal benefit is reaped. To satisfy the demand of power system and optimize the operation of cascade hydropower stations at the same time, a daily joint optimization model of cascade hydropower stations is established, considering the daily power load curve and power generation of a single station. Then a heuristic hierarchic optimization (HHO) strategy is proposed to solve the model. The total hydroenergy consumption of single and joint operation of cascade hydropower stations of Qingjiang River is calculated. The results make clear that comparing with single operation, the hydroenergy consumption of joint operation is less, which is of great significance to cascade hydropower stations. The modeling and solution can be good references to cascade hydropower stations dispatched by the same power grid.\",\"PeriodicalId\":241850,\"journal\":{\"name\":\"2016 IEEE International Conference on Knowledge Engineering and Applications (ICKEA)\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Knowledge Engineering and Applications (ICKEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICKEA.2016.7803026\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Knowledge Engineering and Applications (ICKEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICKEA.2016.7803026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Short-term joint optimization of cascade hydropower stations on daily power load curve
Short-term operation of hydropower stations is a vital part of power grid scheduling. In order to ensure security and stability of power grid, it is of great importance for stations to operate according to the power grid instructions. Yet as far as stations concerned, they'd like to run as an economical way so that the maximal benefit is reaped. To satisfy the demand of power system and optimize the operation of cascade hydropower stations at the same time, a daily joint optimization model of cascade hydropower stations is established, considering the daily power load curve and power generation of a single station. Then a heuristic hierarchic optimization (HHO) strategy is proposed to solve the model. The total hydroenergy consumption of single and joint operation of cascade hydropower stations of Qingjiang River is calculated. The results make clear that comparing with single operation, the hydroenergy consumption of joint operation is less, which is of great significance to cascade hydropower stations. The modeling and solution can be good references to cascade hydropower stations dispatched by the same power grid.