Jeongje Park, Wu Liang, Jaeseok Choi, D. Jeon, T. Tran, R. Billinton
{"title":"韩国电网可靠性评估:第四次供电计划","authors":"Jeongje Park, Wu Liang, Jaeseok Choi, D. Jeon, T. Tran, R. Billinton","doi":"10.1109/TD-ASIA.2009.5356965","DOIUrl":null,"url":null,"abstract":"The importance and conducting necessity studies on grid reliability evaluation have been increasingly important in recent years due to the number of black-out events occurring through in the world. Quantity evaluation of transmission system reliability is very important in a competitive electricity environment. The reason is that the successful operation of electric power under a deregulated electricity market depends on transmission system reliability management. Also in Korea it takes places. The results of many case studies for the KEPCO system using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper. Some sensitivity analysis has been included in case study. This paper presents the reliability analysis of KEPCO system expansion planning, fourth supply plan, by using TRELSS program.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Reliability evaluation of grid in Korea: Fourth supply plan\",\"authors\":\"Jeongje Park, Wu Liang, Jaeseok Choi, D. Jeon, T. Tran, R. Billinton\",\"doi\":\"10.1109/TD-ASIA.2009.5356965\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The importance and conducting necessity studies on grid reliability evaluation have been increasingly important in recent years due to the number of black-out events occurring through in the world. Quantity evaluation of transmission system reliability is very important in a competitive electricity environment. The reason is that the successful operation of electric power under a deregulated electricity market depends on transmission system reliability management. Also in Korea it takes places. The results of many case studies for the KEPCO system using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper. Some sensitivity analysis has been included in case study. This paper presents the reliability analysis of KEPCO system expansion planning, fourth supply plan, by using TRELSS program.\",\"PeriodicalId\":131589,\"journal\":{\"name\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TD-ASIA.2009.5356965\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356965","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reliability evaluation of grid in Korea: Fourth supply plan
The importance and conducting necessity studies on grid reliability evaluation have been increasingly important in recent years due to the number of black-out events occurring through in the world. Quantity evaluation of transmission system reliability is very important in a competitive electricity environment. The reason is that the successful operation of electric power under a deregulated electricity market depends on transmission system reliability management. Also in Korea it takes places. The results of many case studies for the KEPCO system using the Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Version 6_2, a program developed by EPRI are introduced in this paper. Some sensitivity analysis has been included in case study. This paper presents the reliability analysis of KEPCO system expansion planning, fourth supply plan, by using TRELSS program.