Edric Wijaya, Petrus Haryanto Wibowo, Usmanul Hayadi Umar
{"title":"Analisa terhadap Penerapan Timeframe pada Perumahan Winner Flower House Punggur","authors":"Edric Wijaya, Petrus Haryanto Wibowo, Usmanul Hayadi Umar","doi":"10.37253/jcep.v3i1.1251","DOIUrl":null,"url":null,"abstract":"This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. This study aims to estimate the time for material procurement based on the time schedule for the construction project of the Punggur Flower House Winner. The method used to determine the estimated time is the conventional method, where the scheduling process is the scheduling process where the measurements are taken, in planning meetings, in measuring, and making scheduling times more regular and systematic. This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. The estimated work plan for this project is 52 weeks and the realization of this project is 52 weeks. Thus it can be concluded that the processing time until the completion of the work is not delayed.","PeriodicalId":102190,"journal":{"name":"Journal of Civil Engineering and Planning","volume":"146 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37253/jcep.v3i1.1251","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
本研究将讨论关于Winner Flower住宅开发的问题,该住宅后来将作为住宅,商店和公寓,并拥有俱乐部会所和游泳池等设施。本研究的目的是根据Punggur Flower House Winner建设项目的进度计划估算材料采购时间。用于确定估计时间的方法是传统方法,其中调度过程是进行测量的调度过程,在计划会议中,在测量中,并使调度时间更有规律和系统。本研究将讨论关于Winner Flower住宅开发的问题,该住宅后来将作为住宅,商店和公寓,并拥有俱乐部会所和游泳池等设施。本项目预计工作计划为52周,实现时间为52周。由此可以得出结论,直到完成工作的处理时间没有延迟。
Analisa terhadap Penerapan Timeframe pada Perumahan Winner Flower House Punggur
This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. This study aims to estimate the time for material procurement based on the time schedule for the construction project of the Punggur Flower House Winner. The method used to determine the estimated time is the conventional method, where the scheduling process is the scheduling process where the measurements are taken, in planning meetings, in measuring, and making scheduling times more regular and systematic. This research will discuss about Winner Flower housing development The house which will later function as a residence, shop and apartment, and has facilities such as a club house and a swimming pool. The estimated work plan for this project is 52 weeks and the realization of this project is 52 weeks. Thus it can be concluded that the processing time until the completion of the work is not delayed.