blumbang banjararum kalibawang kulonprogo微型水力发电厂容量可行性研究

Lintang Timur, Fifin Hindarti, Rosiana Indrawati
{"title":"blumbang banjararum kalibawang kulonprogo微型水力发电厂容量可行性研究","authors":"Lintang Timur, Fifin Hindarti, Rosiana Indrawati","doi":"10.22146/ajse.v4i2.62641","DOIUrl":null,"url":null,"abstract":"The Blumbang micro hydro power plant is a power plant utilizing hydropower that supplies electricity to the Blumbang area. The resulting supply is very large, around 30 kWh. However, it cannot be fully used by the surrounding society. So, it is necessary to do a feasibility study to increase the power capacity to determine supply and demand. This research aims to determine the community's supply and demand, which will impact the potential that can be taken by society.The method used is field observations, supply and demand observations, analysis of differences in supply and demand. The results that the feasibility of increasing the power capacity. It supplies generated from PLTMH Blumbang ranges from 24-26 kWh of the electricity demand of micro hydro power plant, 6 kWh demand electricity of micro hydro power plant and PLN 16 kWh. The Blumbang society's electricity bill has decreased with the Blumbang micro hydro power plant.","PeriodicalId":280593,"journal":{"name":"ASEAN Journal of Systems Engineering","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"FEASIBILITY STUDY OF MICRO HYDRO POWER PLANT CAPACITY IN BLUMBANG BANJARARUM KALIBAWANG KULONPROGO\",\"authors\":\"Lintang Timur, Fifin Hindarti, Rosiana Indrawati\",\"doi\":\"10.22146/ajse.v4i2.62641\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Blumbang micro hydro power plant is a power plant utilizing hydropower that supplies electricity to the Blumbang area. The resulting supply is very large, around 30 kWh. However, it cannot be fully used by the surrounding society. So, it is necessary to do a feasibility study to increase the power capacity to determine supply and demand. This research aims to determine the community's supply and demand, which will impact the potential that can be taken by society.The method used is field observations, supply and demand observations, analysis of differences in supply and demand. The results that the feasibility of increasing the power capacity. It supplies generated from PLTMH Blumbang ranges from 24-26 kWh of the electricity demand of micro hydro power plant, 6 kWh demand electricity of micro hydro power plant and PLN 16 kWh. The Blumbang society's electricity bill has decreased with the Blumbang micro hydro power plant.\",\"PeriodicalId\":280593,\"journal\":{\"name\":\"ASEAN Journal of Systems Engineering\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASEAN Journal of Systems Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22146/ajse.v4i2.62641\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASEAN Journal of Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22146/ajse.v4i2.62641","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

布隆邦微型水力发电厂是利用水力向布隆邦地区供电的发电厂。由此产生的供电量非常大,约为30千瓦时。然而,它不能被周围的社会充分利用。因此,有必要对增加电力容量进行可行性研究,以确定供需关系。本研究旨在确定社区的供给和需求,这将影响社会可以采取的潜力。所采用的方法是实地观察、供需观察、供需差异分析。结果表明,提高发电容量是可行的。PLTMH Blumbang提供的微水电厂用电需求24-26千瓦时,微水电厂用电需求6千瓦时,PLN供电16千瓦时。随着布隆邦微型水力发电厂的建设,布隆邦社会的电费也减少了。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
FEASIBILITY STUDY OF MICRO HYDRO POWER PLANT CAPACITY IN BLUMBANG BANJARARUM KALIBAWANG KULONPROGO
The Blumbang micro hydro power plant is a power plant utilizing hydropower that supplies electricity to the Blumbang area. The resulting supply is very large, around 30 kWh. However, it cannot be fully used by the surrounding society. So, it is necessary to do a feasibility study to increase the power capacity to determine supply and demand. This research aims to determine the community's supply and demand, which will impact the potential that can be taken by society.The method used is field observations, supply and demand observations, analysis of differences in supply and demand. The results that the feasibility of increasing the power capacity. It supplies generated from PLTMH Blumbang ranges from 24-26 kWh of the electricity demand of micro hydro power plant, 6 kWh demand electricity of micro hydro power plant and PLN 16 kWh. The Blumbang society's electricity bill has decreased with the Blumbang micro hydro power plant.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信