ERCOT综合传输建模数据系统实施的经验教训

J. Moseley, N. Mago, W. Grady, S. Santoso
{"title":"ERCOT综合传输建模数据系统实施的经验教训","authors":"J. Moseley, N. Mago, W. Grady, S. Santoso","doi":"10.1109/JPETS.2014.2363405","DOIUrl":null,"url":null,"abstract":"On 1 September 2009, as part of a new node-based market implementation, the Electric Reliability Council of Texas transitioned from its then-prevalent data modeling processes to a new network model management system (NMMS) for model data management. This change represented the culmination of nearly four and a half years of planning and development. The NMMS provided several improvements over the then-current data maintenance processes. This paper describes some of the existing issues facing the power industry in the area of power system model data management and explains how solutions to these issues were addressed conceptually in the development of and incorporated into the final design of the NMMS. Further, this paper explains how these concepts of design and usability are now gaining wider recognition and acceptance from the industry.","PeriodicalId":170601,"journal":{"name":"IEEE Power and Energy Technology Systems Journal","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Lessons and Experiences in the Implementation of a Consolidated Transmission Modeling Data System at ERCOT\",\"authors\":\"J. Moseley, N. Mago, W. Grady, S. Santoso\",\"doi\":\"10.1109/JPETS.2014.2363405\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"On 1 September 2009, as part of a new node-based market implementation, the Electric Reliability Council of Texas transitioned from its then-prevalent data modeling processes to a new network model management system (NMMS) for model data management. This change represented the culmination of nearly four and a half years of planning and development. The NMMS provided several improvements over the then-current data maintenance processes. This paper describes some of the existing issues facing the power industry in the area of power system model data management and explains how solutions to these issues were addressed conceptually in the development of and incorporated into the final design of the NMMS. Further, this paper explains how these concepts of design and usability are now gaining wider recognition and acceptance from the industry.\",\"PeriodicalId\":170601,\"journal\":{\"name\":\"IEEE Power and Energy Technology Systems Journal\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Power and Energy Technology Systems Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JPETS.2014.2363405\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power and Energy Technology Systems Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JPETS.2014.2363405","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

2009年9月1日,作为新的基于节点的市场实施的一部分,德克萨斯州电力可靠性委员会从其当时流行的数据建模过程过渡到用于模型数据管理的新的网络模型管理系统(NMMS)。这一变化代表了近四年半的规划和开发的高潮。NMMS对当时的数据维护流程进行了若干改进。本文描述了电力行业在电力系统模型数据管理领域面临的一些现有问题,并解释了如何在开发过程中从概念上解决这些问题,并将其纳入NMMS的最终设计中。此外,本文还解释了这些设计和可用性的概念是如何在业界获得更广泛的认可和接受的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lessons and Experiences in the Implementation of a Consolidated Transmission Modeling Data System at ERCOT
On 1 September 2009, as part of a new node-based market implementation, the Electric Reliability Council of Texas transitioned from its then-prevalent data modeling processes to a new network model management system (NMMS) for model data management. This change represented the culmination of nearly four and a half years of planning and development. The NMMS provided several improvements over the then-current data maintenance processes. This paper describes some of the existing issues facing the power industry in the area of power system model data management and explains how solutions to these issues were addressed conceptually in the development of and incorporated into the final design of the NMMS. Further, this paper explains how these concepts of design and usability are now gaining wider recognition and acceptance from the industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信