{"title":"新变电站BH Centro 2-贝洛奥里藏特-米纳斯吉拉斯州-巴西的电气示意图概念","authors":"A. M. Oliveira, P. C. C. D. Costa","doi":"10.1109/TDC-LA.2010.5762954","DOIUrl":null,"url":null,"abstract":"This paper presents the electric diagram conception of the new substation BH Centro 2, which will substitute the existent substation BH Centro 1, that currently supplies the central area of Belo Horizonte city. The BH Centro 1 substation is the biggest substation of Cemig Distribution Company, with regard to its transformation capacity (138-13.8 kV – 150 MVA). Operating since 1970, the substation has been showing maintenance problems associates to the difficulty of attainment of spare parts for some equipment and rise of the risk of failure due to its high period of operation. Thus, the construction of a new substation was defined. The conception of the BH Centro 2 substation faced some challenges, due limitations of space, special operational requirements because of medium voltage networks characteristics and short-circuits level limitation. Besides, we tried to avoid the utilization of special equipments, like high impedance transformers and high capacity reactors.","PeriodicalId":222318,"journal":{"name":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Electric diagram conception of a new substation BH Centro 2- Belo Horizonte - Minas Gerais - Brazil\",\"authors\":\"A. M. Oliveira, P. C. C. D. Costa\",\"doi\":\"10.1109/TDC-LA.2010.5762954\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the electric diagram conception of the new substation BH Centro 2, which will substitute the existent substation BH Centro 1, that currently supplies the central area of Belo Horizonte city. The BH Centro 1 substation is the biggest substation of Cemig Distribution Company, with regard to its transformation capacity (138-13.8 kV – 150 MVA). Operating since 1970, the substation has been showing maintenance problems associates to the difficulty of attainment of spare parts for some equipment and rise of the risk of failure due to its high period of operation. Thus, the construction of a new substation was defined. The conception of the BH Centro 2 substation faced some challenges, due limitations of space, special operational requirements because of medium voltage networks characteristics and short-circuits level limitation. Besides, we tried to avoid the utilization of special equipments, like high impedance transformers and high capacity reactors.\",\"PeriodicalId\":222318,\"journal\":{\"name\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC-LA.2010.5762954\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2010.5762954","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了新变电站BH Centro 2的电气示意图,该变电站将取代目前为贝洛奥里藏特市中心地区供电的现有变电站BH Centro 1。BH Centro 1变电站是Cemig配电公司最大的变电站,其变电能力(138-13.8 kV - 150 MVA)。该变电站自1970年开始运行以来,由于一些设备的备件难以获得,并且由于其高运行期而导致故障风险上升,因此一直存在维护问题。因此,一个新的变电站的建设是确定的。BH Centro 2变电站的设计面临着一些挑战,包括空间的限制、中压网络特性对运行的特殊要求以及短路水平的限制。此外,我们尽量避免使用特殊设备,如高阻抗变压器和大容量电抗器。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Electric diagram conception of a new substation BH Centro 2- Belo Horizonte - Minas Gerais - Brazil
This paper presents the electric diagram conception of the new substation BH Centro 2, which will substitute the existent substation BH Centro 1, that currently supplies the central area of Belo Horizonte city. The BH Centro 1 substation is the biggest substation of Cemig Distribution Company, with regard to its transformation capacity (138-13.8 kV – 150 MVA). Operating since 1970, the substation has been showing maintenance problems associates to the difficulty of attainment of spare parts for some equipment and rise of the risk of failure due to its high period of operation. Thus, the construction of a new substation was defined. The conception of the BH Centro 2 substation faced some challenges, due limitations of space, special operational requirements because of medium voltage networks characteristics and short-circuits level limitation. Besides, we tried to avoid the utilization of special equipments, like high impedance transformers and high capacity reactors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信