{"title":"面向新技术集成的动态多用途电源-硬件在环系统的建立","authors":"J. Geisbuesch, S. Karrari, Philip Kreideweis, W. D. Sousa, M. Noe","doi":"10.1109/CompEng.2018.8536233","DOIUrl":null,"url":null,"abstract":"Future requirements on the energy system give rise to a strong increase of complexity in the electricity grid. This successively prohibits the unreflected incorporation and also testing of new equipment in the grid as well as uninformed changes to its structure. A solution to this challenge is to establish a (laboratory) environment to gain realistic and reliable insights. A viable option constitutes a Power-Hardware-in-the-Loop environment providing real-time simulation and system integration facilities. The successful set-up of a medium power level (30 kVA) Power-Hardware-in-the-Loop laboratory, which represents one of the most flexible and dynamic set-ups of its kind, is described. The requirements on components are detailed and the commissioning of the system is outlined. First results for the integration of new power hardware into the grid obtained with the system are presented.","PeriodicalId":194279,"journal":{"name":"2018 IEEE Workshop on Complexity in Engineering (COMPENG)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Set-Up of a Dynamic Multi-Purpose Power-Hardware-in-the-Loop System for New Technologies Integration\",\"authors\":\"J. Geisbuesch, S. Karrari, Philip Kreideweis, W. D. Sousa, M. Noe\",\"doi\":\"10.1109/CompEng.2018.8536233\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Future requirements on the energy system give rise to a strong increase of complexity in the electricity grid. This successively prohibits the unreflected incorporation and also testing of new equipment in the grid as well as uninformed changes to its structure. A solution to this challenge is to establish a (laboratory) environment to gain realistic and reliable insights. A viable option constitutes a Power-Hardware-in-the-Loop environment providing real-time simulation and system integration facilities. The successful set-up of a medium power level (30 kVA) Power-Hardware-in-the-Loop laboratory, which represents one of the most flexible and dynamic set-ups of its kind, is described. The requirements on components are detailed and the commissioning of the system is outlined. First results for the integration of new power hardware into the grid obtained with the system are presented.\",\"PeriodicalId\":194279,\"journal\":{\"name\":\"2018 IEEE Workshop on Complexity in Engineering (COMPENG)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE Workshop on Complexity in Engineering (COMPENG)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CompEng.2018.8536233\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE Workshop on Complexity in Engineering (COMPENG)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CompEng.2018.8536233","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

未来对能源系统的要求使电网的复杂性大大增加。这先后禁止未经反映的并入和测试电网中的新设备,以及对其结构的不知情的改变。应对这一挑战的解决方案是建立一个(实验室)环境,以获得现实和可靠的见解。一个可行的选择是组成电源-硬件在环环境,提供实时仿真和系统集成设施。介绍了一个中等功率级(30kva)电源-硬件在环实验室的成功建立,它代表了同类中最灵活和动态的设置之一。详细介绍了系统对各部件的要求,并对系统的调试进行了概述。给出了该系统首次将新型电力硬件集成到电网中的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Set-Up of a Dynamic Multi-Purpose Power-Hardware-in-the-Loop System for New Technologies Integration
Future requirements on the energy system give rise to a strong increase of complexity in the electricity grid. This successively prohibits the unreflected incorporation and also testing of new equipment in the grid as well as uninformed changes to its structure. A solution to this challenge is to establish a (laboratory) environment to gain realistic and reliable insights. A viable option constitutes a Power-Hardware-in-the-Loop environment providing real-time simulation and system integration facilities. The successful set-up of a medium power level (30 kVA) Power-Hardware-in-the-Loop laboratory, which represents one of the most flexible and dynamic set-ups of its kind, is described. The requirements on components are detailed and the commissioning of the system is outlined. First results for the integration of new power hardware into the grid obtained with the system are presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信