Hiroki Hayasaka, Kaisei Kanetani, Sohei Nakashima, M. Yamazaki, T. Babasaki, Risshi Kondo, Masami Amano
{"title":"ICT电源和空调设备维修批次缺陷检测方法及验证结果","authors":"Hiroki Hayasaka, Kaisei Kanetani, Sohei Nakashima, M. Yamazaki, T. Babasaki, Risshi Kondo, Masami Amano","doi":"10.1109/INTLEC.2017.8214122","DOIUrl":null,"url":null,"abstract":"In this paper, we report on a method of finding lot defects and the results of a verification related to the maintenance of power-supply and air-conditioning equipment for ICT. We built a logic and models to automatically detect equipment that may be included in a defective lot. An equipment anomaly analysis system was constructed. For verification, actual past lot failure equipment was applied to the logic and models for comparison with the conventional method. As a result, detection of lot defects became faster in 3 out of 4 cases. Lot defects were generally detected at an early stage. In addition, the result of operating the equipment anomaly analysis system is described.","PeriodicalId":366207,"journal":{"name":"2017 IEEE International Telecommunications Energy Conference (INTELEC)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Method for detection of lot defects for maintenance of ICT power supplies and air conditioning equipment and verification results\",\"authors\":\"Hiroki Hayasaka, Kaisei Kanetani, Sohei Nakashima, M. Yamazaki, T. Babasaki, Risshi Kondo, Masami Amano\",\"doi\":\"10.1109/INTLEC.2017.8214122\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we report on a method of finding lot defects and the results of a verification related to the maintenance of power-supply and air-conditioning equipment for ICT. We built a logic and models to automatically detect equipment that may be included in a defective lot. An equipment anomaly analysis system was constructed. For verification, actual past lot failure equipment was applied to the logic and models for comparison with the conventional method. As a result, detection of lot defects became faster in 3 out of 4 cases. Lot defects were generally detected at an early stage. In addition, the result of operating the equipment anomaly analysis system is described.\",\"PeriodicalId\":366207,\"journal\":{\"name\":\"2017 IEEE International Telecommunications Energy Conference (INTELEC)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE International Telecommunications Energy Conference (INTELEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INTLEC.2017.8214122\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE International Telecommunications Energy Conference (INTELEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INTLEC.2017.8214122","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Method for detection of lot defects for maintenance of ICT power supplies and air conditioning equipment and verification results
In this paper, we report on a method of finding lot defects and the results of a verification related to the maintenance of power-supply and air-conditioning equipment for ICT. We built a logic and models to automatically detect equipment that may be included in a defective lot. An equipment anomaly analysis system was constructed. For verification, actual past lot failure equipment was applied to the logic and models for comparison with the conventional method. As a result, detection of lot defects became faster in 3 out of 4 cases. Lot defects were generally detected at an early stage. In addition, the result of operating the equipment anomaly analysis system is described.