基于工作流的钻井工程协同设计系统过程管理研究

Bing Zhang, Jiyou Xiong, Zhikun Liu, Yanwei Bai, Qi Li
{"title":"基于工作流的钻井工程协同设计系统过程管理研究","authors":"Bing Zhang, Jiyou Xiong, Zhikun Liu, Yanwei Bai, Qi Li","doi":"10.1109/FSKD.2012.6234118","DOIUrl":null,"url":null,"abstract":"The drilling engineering design of a well needs collaborative work of designers from multidisciplinary fields such as geology, reservoir engineering and drilling engineering, or designers distributed in different departments. Because there is closely data relevance among every parts of the drilling engineering design which needs the designers in different departments to exchange a lot of data and documents according to a certain design process, any delay in parts of design process will affect the timeliness and accuracy of the whole drilling engineering design. The authors integrated workflow theory into process management of drilling engineering collaborative design system, built workflow management model of Drilling Engineering Collaborative Design System. The paper analyses function of the five sub-modules in this model in detail combining realization process of the system. So it provides an effective method for process management of Drilling Engineering Collaborative Design System, and improved actual operating efficiency of the system.","PeriodicalId":337941,"journal":{"name":"International Conference on Fuzzy Systems and Knowledge Discovery","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research of process management on drilling engineering collaborative design system based on workflow\",\"authors\":\"Bing Zhang, Jiyou Xiong, Zhikun Liu, Yanwei Bai, Qi Li\",\"doi\":\"10.1109/FSKD.2012.6234118\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The drilling engineering design of a well needs collaborative work of designers from multidisciplinary fields such as geology, reservoir engineering and drilling engineering, or designers distributed in different departments. Because there is closely data relevance among every parts of the drilling engineering design which needs the designers in different departments to exchange a lot of data and documents according to a certain design process, any delay in parts of design process will affect the timeliness and accuracy of the whole drilling engineering design. The authors integrated workflow theory into process management of drilling engineering collaborative design system, built workflow management model of Drilling Engineering Collaborative Design System. The paper analyses function of the five sub-modules in this model in detail combining realization process of the system. So it provides an effective method for process management of Drilling Engineering Collaborative Design System, and improved actual operating efficiency of the system.\",\"PeriodicalId\":337941,\"journal\":{\"name\":\"International Conference on Fuzzy Systems and Knowledge Discovery\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Fuzzy Systems and Knowledge Discovery\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FSKD.2012.6234118\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Fuzzy Systems and Knowledge Discovery","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FSKD.2012.6234118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一口井的钻井工程设计需要来自地质、油藏工程、钻井工程等多学科领域的设计人员或分布在不同部门的设计人员的协同工作。由于钻井工程设计的各个部分之间存在着紧密的数据关联,需要不同部门的设计人员按照一定的设计流程进行大量的数据和文件的交换,因此设计过程中的任何一个部分的延迟都会影响整个钻井工程设计的及时性和准确性。将工作流理论融入钻井工程协同设计系统的流程管理中,建立了钻井工程协同设计系统的工作流管理模型。结合系统的实现过程,详细分析了该模型中五个子模块的功能。为钻井工程协同设计系统的过程管理提供了一种有效的方法,提高了系统的实际运行效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research of process management on drilling engineering collaborative design system based on workflow
The drilling engineering design of a well needs collaborative work of designers from multidisciplinary fields such as geology, reservoir engineering and drilling engineering, or designers distributed in different departments. Because there is closely data relevance among every parts of the drilling engineering design which needs the designers in different departments to exchange a lot of data and documents according to a certain design process, any delay in parts of design process will affect the timeliness and accuracy of the whole drilling engineering design. The authors integrated workflow theory into process management of drilling engineering collaborative design system, built workflow management model of Drilling Engineering Collaborative Design System. The paper analyses function of the five sub-modules in this model in detail combining realization process of the system. So it provides an effective method for process management of Drilling Engineering Collaborative Design System, and improved actual operating efficiency of the system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信