{"title":"ELT光学抛光的第一步","authors":"R. Geyl, D. Bardon, R. Bourgois, N. Ferachoglou, E. Harel, C. Couteret","doi":"10.1117/12.2317604","DOIUrl":null,"url":null,"abstract":"Green light for the construction of the 39-m aperture giant Extremely Large Telescope (ELT) was given by the European Southern Observatory (ESO) council on Dec 4th, 2014. Procurement of the key elements, especially the optics, was immediately initiated by ESO team. Up today, Safran Reosc was awarded all the key optical polishing and testing contracts with: 2015-07: contract for the Adaptive Optics M4 mirror thin glass petals, 2016-07: contract for the 4-m M2 convex mirror, 2017-02: contract for the 4-m M3 mirror. 2017-05: contract for polishing and intergation of the 931 1.45-m hexagonal segments for the giant 39-m M1 mirror assembly This paper is dedicated to highlighting the various challenges linked to these various optical fabrication projects and reporting about the progress of our work so far.","PeriodicalId":422212,"journal":{"name":"Precision Optics Manufacturing","volume":"493 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"First steps in ELT optics polishing\",\"authors\":\"R. Geyl, D. Bardon, R. Bourgois, N. Ferachoglou, E. Harel, C. Couteret\",\"doi\":\"10.1117/12.2317604\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Green light for the construction of the 39-m aperture giant Extremely Large Telescope (ELT) was given by the European Southern Observatory (ESO) council on Dec 4th, 2014. Procurement of the key elements, especially the optics, was immediately initiated by ESO team. Up today, Safran Reosc was awarded all the key optical polishing and testing contracts with: 2015-07: contract for the Adaptive Optics M4 mirror thin glass petals, 2016-07: contract for the 4-m M2 convex mirror, 2017-02: contract for the 4-m M3 mirror. 2017-05: contract for polishing and intergation of the 931 1.45-m hexagonal segments for the giant 39-m M1 mirror assembly This paper is dedicated to highlighting the various challenges linked to these various optical fabrication projects and reporting about the progress of our work so far.\",\"PeriodicalId\":422212,\"journal\":{\"name\":\"Precision Optics Manufacturing\",\"volume\":\"493 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Precision Optics Manufacturing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2317604\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Precision Optics Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2317604","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

2014年12月4日,欧洲南方天文台(ESO)理事会为建造39米口径的超大望远镜(ELT)开了绿灯。ESO团队立即启动了关键元件的采购,特别是光学元件。今天,赛峰Reosc获得了所有关键的光学抛光和测试合同,包括:2015-07:自适应光学M4镜面薄玻璃花瓣合同,2016-07:4米M2凸面镜合同,2017-02:4米M3镜面合同。2017-05:为巨大的39米M1反射镜组件抛光和集成931个1.45米六角形部分的合同。本文致力于强调与这些不同光学制造项目相关的各种挑战,并报告我们到目前为止的工作进展。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
First steps in ELT optics polishing
Green light for the construction of the 39-m aperture giant Extremely Large Telescope (ELT) was given by the European Southern Observatory (ESO) council on Dec 4th, 2014. Procurement of the key elements, especially the optics, was immediately initiated by ESO team. Up today, Safran Reosc was awarded all the key optical polishing and testing contracts with: 2015-07: contract for the Adaptive Optics M4 mirror thin glass petals, 2016-07: contract for the 4-m M2 convex mirror, 2017-02: contract for the 4-m M3 mirror. 2017-05: contract for polishing and intergation of the 931 1.45-m hexagonal segments for the giant 39-m M1 mirror assembly This paper is dedicated to highlighting the various challenges linked to these various optical fabrication projects and reporting about the progress of our work so far.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信