新一代的传输影响和可视化

D. Smith, T. Overbye
{"title":"新一代的传输影响和可视化","authors":"D. Smith, T. Overbye","doi":"10.1109/EEIC.2001.965698","DOIUrl":null,"url":null,"abstract":"With deregulation in the electric industry the process of siting new generation has changed dramatically. In the previous vertically integrated utility paradigm, the local utility could bundle the cost of new transmission with the costs associated with adding generation. With deregulation, independent generators usually wish to site at locations in which their new generation will not cause any new overloads in the transmission grid. This paper describes a process for systematically determining the impact new generation will have on the transmission system. Emphasis is also placed on the visualization of these transmission system impacts.","PeriodicalId":228071,"journal":{"name":"Proceedings: Electrical Insulation Conference and Electrical Manufacturing and Coil Winding Conference (Cat. No.01CH37264)","volume":"28 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Transmission impacts and visualization of new generation\",\"authors\":\"D. Smith, T. Overbye\",\"doi\":\"10.1109/EEIC.2001.965698\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With deregulation in the electric industry the process of siting new generation has changed dramatically. In the previous vertically integrated utility paradigm, the local utility could bundle the cost of new transmission with the costs associated with adding generation. With deregulation, independent generators usually wish to site at locations in which their new generation will not cause any new overloads in the transmission grid. This paper describes a process for systematically determining the impact new generation will have on the transmission system. Emphasis is also placed on the visualization of these transmission system impacts.\",\"PeriodicalId\":228071,\"journal\":{\"name\":\"Proceedings: Electrical Insulation Conference and Electrical Manufacturing and Coil Winding Conference (Cat. No.01CH37264)\",\"volume\":\"28 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings: Electrical Insulation Conference and Electrical Manufacturing and Coil Winding Conference (Cat. No.01CH37264)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEIC.2001.965698\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings: Electrical Insulation Conference and Electrical Manufacturing and Coil Winding Conference (Cat. No.01CH37264)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEIC.2001.965698","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

随着电力行业的放松管制,新一代电厂的选址过程发生了巨大变化。在以前垂直整合的公用事业范例中,当地公用事业公司可以将新传输的成本与增加发电的成本捆绑在一起。随着管制的放松,独立发电商通常希望在他们的新一代不会对输电网造成任何新的过载的地方选址。本文描述了一个系统地确定新一代对输电系统的影响的过程。重点还放在这些传输系统影响的可视化上。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transmission impacts and visualization of new generation
With deregulation in the electric industry the process of siting new generation has changed dramatically. In the previous vertically integrated utility paradigm, the local utility could bundle the cost of new transmission with the costs associated with adding generation. With deregulation, independent generators usually wish to site at locations in which their new generation will not cause any new overloads in the transmission grid. This paper describes a process for systematically determining the impact new generation will have on the transmission system. Emphasis is also placed on the visualization of these transmission system impacts.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信