{"title":"简单的升压转换器使用定时器IC 555充电电容器组","authors":"M. Rezal, N. Mariun, I. Aris","doi":"10.1109/SCORED.2010.5704015","DOIUrl":null,"url":null,"abstract":"A boost converter is capable to increase input voltage to a certain voltage level which is required by a high voltage load. In this project, a 12V battery is used as input voltage to the boost converter circuit. The Timer IC 555 is the main control device used to control the switching of the MOSFET. The main objectives of this project are to study and design a simple, portable, and low cost boost converter for charging capacitor banks.","PeriodicalId":277771,"journal":{"name":"2010 IEEE Student Conference on Research and Development (SCOReD)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Simple boost converter using Timer IC 555 for charging capacitor banks\",\"authors\":\"M. Rezal, N. Mariun, I. Aris\",\"doi\":\"10.1109/SCORED.2010.5704015\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A boost converter is capable to increase input voltage to a certain voltage level which is required by a high voltage load. In this project, a 12V battery is used as input voltage to the boost converter circuit. The Timer IC 555 is the main control device used to control the switching of the MOSFET. The main objectives of this project are to study and design a simple, portable, and low cost boost converter for charging capacitor banks.\",\"PeriodicalId\":277771,\"journal\":{\"name\":\"2010 IEEE Student Conference on Research and Development (SCOReD)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE Student Conference on Research and Development (SCOReD)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SCORED.2010.5704015\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Student Conference on Research and Development (SCOReD)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SCORED.2010.5704015","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Simple boost converter using Timer IC 555 for charging capacitor banks
A boost converter is capable to increase input voltage to a certain voltage level which is required by a high voltage load. In this project, a 12V battery is used as input voltage to the boost converter circuit. The Timer IC 555 is the main control device used to control the switching of the MOSFET. The main objectives of this project are to study and design a simple, portable, and low cost boost converter for charging capacitor banks.