{"title":"形成创新项目组合","authors":"M. G. Golovkova, N. V. Lashmanova, I. Brusakova","doi":"10.1109/IVFORUM.2015.7388257","DOIUrl":null,"url":null,"abstract":"The article is devoted to the problem of formation of innovative project portfolio. The technique is based on classical models of portfolio analysis BCG. As selection criteria it is proposed to consider the integrated risk project and resource consumption. These criteria reflected in the indicators of ≪the relative riskiness of the project and the relative contribution margin≫, which formed the basis of the matrix array of projects. Thus, based on the construction of the matrix array of projects portfolio of projects in relation to the strategic goals of the organization and existing constraints.","PeriodicalId":335258,"journal":{"name":"2015 IV Forum Strategic Partnership of Universities and Enterprises of Hi-Tech Branches (Science. Education. Innovations)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Formation of innovative project portfolio\",\"authors\":\"M. G. Golovkova, N. V. Lashmanova, I. Brusakova\",\"doi\":\"10.1109/IVFORUM.2015.7388257\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article is devoted to the problem of formation of innovative project portfolio. The technique is based on classical models of portfolio analysis BCG. As selection criteria it is proposed to consider the integrated risk project and resource consumption. These criteria reflected in the indicators of ≪the relative riskiness of the project and the relative contribution margin≫, which formed the basis of the matrix array of projects. Thus, based on the construction of the matrix array of projects portfolio of projects in relation to the strategic goals of the organization and existing constraints.\",\"PeriodicalId\":335258,\"journal\":{\"name\":\"2015 IV Forum Strategic Partnership of Universities and Enterprises of Hi-Tech Branches (Science. Education. Innovations)\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IV Forum Strategic Partnership of Universities and Enterprises of Hi-Tech Branches (Science. Education. Innovations)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IVFORUM.2015.7388257\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IV Forum Strategic Partnership of Universities and Enterprises of Hi-Tech Branches (Science. Education. Innovations)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IVFORUM.2015.7388257","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The article is devoted to the problem of formation of innovative project portfolio. The technique is based on classical models of portfolio analysis BCG. As selection criteria it is proposed to consider the integrated risk project and resource consumption. These criteria reflected in the indicators of ≪the relative riskiness of the project and the relative contribution margin≫, which formed the basis of the matrix array of projects. Thus, based on the construction of the matrix array of projects portfolio of projects in relation to the strategic goals of the organization and existing constraints.