1000kw精简版。纽约联合铁路公司自动汞弧整流变电站

W. E. Gutzwiller, O. Naef
{"title":"1000kw精简版。纽约联合铁路公司自动汞弧整流变电站","authors":"W. E. Gutzwiller, O. Naef","doi":"10.1109/JAIEE.1930.6538610","DOIUrl":null,"url":null,"abstract":"A 1000-kw. 625-volt automatic mercury arc rectifier substation, installed by the Union Railway Company of New York, in May, 1929, is described in general in this paper together with the account of the automatic and remote control features of the substations. The principle reasons for the adoption of the mercury arc rectifier are mentioned and operating and performance data for the first ten months' operation are presented.","PeriodicalId":260406,"journal":{"name":"Journal of the A.I.E.E.","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1930-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Abridgment of 1000-kw. automatic mercury arc rectifier substation of the union railway company of New York\",\"authors\":\"W. E. Gutzwiller, O. Naef\",\"doi\":\"10.1109/JAIEE.1930.6538610\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A 1000-kw. 625-volt automatic mercury arc rectifier substation, installed by the Union Railway Company of New York, in May, 1929, is described in general in this paper together with the account of the automatic and remote control features of the substations. The principle reasons for the adoption of the mercury arc rectifier are mentioned and operating and performance data for the first ten months' operation are presented.\",\"PeriodicalId\":260406,\"journal\":{\"name\":\"Journal of the A.I.E.E.\",\"volume\":\"99 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1930-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the A.I.E.E.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/JAIEE.1930.6538610\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the A.I.E.E.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JAIEE.1930.6538610","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1000千瓦。本文对纽约联合铁路公司于1929年5月安装的625伏自动汞弧整流变电站进行了概述,并对该变电站的自动化和遥控特点进行了叙述。介绍了采用汞弧整流器的主要原因,并介绍了前十个月的运行和性能数据。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Abridgment of 1000-kw. automatic mercury arc rectifier substation of the union railway company of New York
A 1000-kw. 625-volt automatic mercury arc rectifier substation, installed by the Union Railway Company of New York, in May, 1929, is described in general in this paper together with the account of the automatic and remote control features of the substations. The principle reasons for the adoption of the mercury arc rectifier are mentioned and operating and performance data for the first ten months' operation are presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信