立体与三立体:利用卫星遥感数据进行人为引起的地貌变化探测的初步结果

Z. Zylshal, Sartika Sartika, A. A. Bayanuddin, S. Munawar, Yohannes Fridolin Hestrio, Sarip Hidayat, I. Pratiwi, A. Setiyoko, Wiwin Setiawan
{"title":"立体与三立体:利用卫星遥感数据进行人为引起的地貌变化探测的初步结果","authors":"Z. Zylshal, Sartika Sartika, A. A. Bayanuddin, S. Munawar, Yohannes Fridolin Hestrio, Sarip Hidayat, I. Pratiwi, A. Setiyoko, Wiwin Setiawan","doi":"10.1109/ICARES56907.2022.9993523","DOIUrl":null,"url":null,"abstract":"The Trans-Sulawesi railway construction runs for 144 km from South to North of the South Sulawesi's east coast. The railway line mostly was built on an embankment over agricultural flat, while on the hill, the railway line built in an incised slope. These actions essentially alter the surrounding landform. The changing landform could have its effect on how the surface runoff flow during the rainy season. In this study, we explore the potential of satellite-derived digital elevation models (DEMs) on detecting the changed landform over the Takkalasi Watershed. We employed the SPOT-7's tri-stereo acquisition mode, acquired on 17th April 2020. In these preliminary results, we compare the DEM results from each pair combination as well as the combination of all three pairs. The use of different tie-points (TP) and ground control points (GCP) were also investigated. Fast Fourier Phase Transformation algorithm were employed for the TP extraction, while the semi-global matching algorithm were employed for the epipolar DEM extractions. The produced DEMs then validated using the reference data taken from dGPS, UAV DEM, as well as the ICESat-2 ATL08 data. Our initial results shows that the best DEM generated is produced by the forward and backward stereo pair using only nine (9) GCP with the average vertical Root Mean Square Error (RMSE) of 4.4 meter. At 3 m ground sampling distance, the incised hill is easier to detect on SPOT-7 DEM compared to the embankment.","PeriodicalId":252801,"journal":{"name":"2022 IEEE International Conference on Aerospace Electronics and Remote Sensing Technology (ICARES)","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Stereo vs. tri-stereo: Preliminary results on Anthropogenic-induced landform change detection using satellite derived remote sensing data\",\"authors\":\"Z. Zylshal, Sartika Sartika, A. A. Bayanuddin, S. Munawar, Yohannes Fridolin Hestrio, Sarip Hidayat, I. Pratiwi, A. Setiyoko, Wiwin Setiawan\",\"doi\":\"10.1109/ICARES56907.2022.9993523\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Trans-Sulawesi railway construction runs for 144 km from South to North of the South Sulawesi's east coast. The railway line mostly was built on an embankment over agricultural flat, while on the hill, the railway line built in an incised slope. These actions essentially alter the surrounding landform. The changing landform could have its effect on how the surface runoff flow during the rainy season. In this study, we explore the potential of satellite-derived digital elevation models (DEMs) on detecting the changed landform over the Takkalasi Watershed. We employed the SPOT-7's tri-stereo acquisition mode, acquired on 17th April 2020. In these preliminary results, we compare the DEM results from each pair combination as well as the combination of all three pairs. The use of different tie-points (TP) and ground control points (GCP) were also investigated. Fast Fourier Phase Transformation algorithm were employed for the TP extraction, while the semi-global matching algorithm were employed for the epipolar DEM extractions. The produced DEMs then validated using the reference data taken from dGPS, UAV DEM, as well as the ICESat-2 ATL08 data. Our initial results shows that the best DEM generated is produced by the forward and backward stereo pair using only nine (9) GCP with the average vertical Root Mean Square Error (RMSE) of 4.4 meter. At 3 m ground sampling distance, the incised hill is easier to detect on SPOT-7 DEM compared to the embankment.\",\"PeriodicalId\":252801,\"journal\":{\"name\":\"2022 IEEE International Conference on Aerospace Electronics and Remote Sensing Technology (ICARES)\",\"volume\":\"63 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE International Conference on Aerospace Electronics and Remote Sensing Technology (ICARES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICARES56907.2022.9993523\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE International Conference on Aerospace Electronics and Remote Sensing Technology (ICARES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICARES56907.2022.9993523","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

跨苏拉威西铁路建设全长144公里,从南苏拉威西东海岸向北延伸。铁路大多建在农田平地上的路堤上,而在山上,铁路则建在切割的斜坡上。这些活动从根本上改变了周围的地形。地形的变化可能会对雨季地表径流的流动产生影响。在这项研究中,我们探讨了卫星衍生的数字高程模型(dem)在探测塔克拉西河流域地形变化方面的潜力。我们采用了2020年4月17日获得的SPOT-7的三立体声采集模式。在这些初步结果中,我们比较了每对组合的DEM结果以及所有三对组合的结果。使用不同的联络点(TP)和地面控制点(GCP)也进行了调查。TP提取采用快速傅立叶相变算法,近极DEM提取采用半全局匹配算法。然后使用从dGPS、无人机DEM以及ICESat-2 ATL08数据中获取的参考数据验证生成的DEM。我们的初步结果表明,仅使用9(9)个GCP的正反向立体对生成的DEM效果最好,平均垂直均方根误差(RMSE)为4.4米。在3米的地面采样距离上,与路堤相比,在SPOT-7 DEM上更容易检测到切割的山丘。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stereo vs. tri-stereo: Preliminary results on Anthropogenic-induced landform change detection using satellite derived remote sensing data
The Trans-Sulawesi railway construction runs for 144 km from South to North of the South Sulawesi's east coast. The railway line mostly was built on an embankment over agricultural flat, while on the hill, the railway line built in an incised slope. These actions essentially alter the surrounding landform. The changing landform could have its effect on how the surface runoff flow during the rainy season. In this study, we explore the potential of satellite-derived digital elevation models (DEMs) on detecting the changed landform over the Takkalasi Watershed. We employed the SPOT-7's tri-stereo acquisition mode, acquired on 17th April 2020. In these preliminary results, we compare the DEM results from each pair combination as well as the combination of all three pairs. The use of different tie-points (TP) and ground control points (GCP) were also investigated. Fast Fourier Phase Transformation algorithm were employed for the TP extraction, while the semi-global matching algorithm were employed for the epipolar DEM extractions. The produced DEMs then validated using the reference data taken from dGPS, UAV DEM, as well as the ICESat-2 ATL08 data. Our initial results shows that the best DEM generated is produced by the forward and backward stereo pair using only nine (9) GCP with the average vertical Root Mean Square Error (RMSE) of 4.4 meter. At 3 m ground sampling distance, the incised hill is easier to detect on SPOT-7 DEM compared to the embankment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信