D. L. Trenggonowati, Maria Ulfah, Asep Ridwan, A. Bahauddin, R. Ekawati, Atia Sonda, A. Umyati, A. R. Fachrur, Y. H. Yadi
{"title":"离散系统仿真方法在供应链绩效分析中的应用——以某家具公司为例","authors":"D. L. Trenggonowati, Maria Ulfah, Asep Ridwan, A. Bahauddin, R. Ekawati, Atia Sonda, A. Umyati, A. R. Fachrur, Y. H. Yadi","doi":"10.36055/jiss.v9i1.19049","DOIUrl":null,"url":null,"abstract":"As time progresses, the evolving industrial world demands that companies devise the best strategies to achieve their desired goals. A well-designed system is expected to increase the profitability of the company itself. CSD is an interior furniture and interior design studio located in the city of Cilegon, Banten. The challenge faced by CSD is the inability to meet order deadlines during periods of high demand. The objective of this study is to assess the level of machine utility within the existing process and provide recommendations to achieve an optimal process. The methodology employed includes system simulation and model development using Promodel software. Additionally, statistical tests, model validation, and ANOVA tests were conducted. Based on the results, it was determined that the level of machine utility at CSD is 17.48% for shaping planning, 30.08% for grinding, 14.88% for assembly, and 29.98% for finishing. The proposed solution, scenario or proposal 2, suggests combining the assembly and finishing workstations, resulting in increased machine utility.","PeriodicalId":111822,"journal":{"name":"Journal Industrial Servicess","volume":"239 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Supply chain performance analysis using discrete system simulation method: A case study in a furniture company\",\"authors\":\"D. L. Trenggonowati, Maria Ulfah, Asep Ridwan, A. Bahauddin, R. Ekawati, Atia Sonda, A. Umyati, A. R. Fachrur, Y. H. Yadi\",\"doi\":\"10.36055/jiss.v9i1.19049\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As time progresses, the evolving industrial world demands that companies devise the best strategies to achieve their desired goals. A well-designed system is expected to increase the profitability of the company itself. CSD is an interior furniture and interior design studio located in the city of Cilegon, Banten. The challenge faced by CSD is the inability to meet order deadlines during periods of high demand. The objective of this study is to assess the level of machine utility within the existing process and provide recommendations to achieve an optimal process. The methodology employed includes system simulation and model development using Promodel software. Additionally, statistical tests, model validation, and ANOVA tests were conducted. Based on the results, it was determined that the level of machine utility at CSD is 17.48% for shaping planning, 30.08% for grinding, 14.88% for assembly, and 29.98% for finishing. The proposed solution, scenario or proposal 2, suggests combining the assembly and finishing workstations, resulting in increased machine utility.\",\"PeriodicalId\":111822,\"journal\":{\"name\":\"Journal Industrial Servicess\",\"volume\":\"239 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal Industrial Servicess\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36055/jiss.v9i1.19049\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal Industrial Servicess","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36055/jiss.v9i1.19049","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Supply chain performance analysis using discrete system simulation method: A case study in a furniture company
As time progresses, the evolving industrial world demands that companies devise the best strategies to achieve their desired goals. A well-designed system is expected to increase the profitability of the company itself. CSD is an interior furniture and interior design studio located in the city of Cilegon, Banten. The challenge faced by CSD is the inability to meet order deadlines during periods of high demand. The objective of this study is to assess the level of machine utility within the existing process and provide recommendations to achieve an optimal process. The methodology employed includes system simulation and model development using Promodel software. Additionally, statistical tests, model validation, and ANOVA tests were conducted. Based on the results, it was determined that the level of machine utility at CSD is 17.48% for shaping planning, 30.08% for grinding, 14.88% for assembly, and 29.98% for finishing. The proposed solution, scenario or proposal 2, suggests combining the assembly and finishing workstations, resulting in increased machine utility.