开发了将技术因素(TF)和环境因素(EF)增强到用例点(UCP)来计算软件工作量估算的方法

Sarwosri, Muhammad Jabir Al Haiyan, Mujahid Husein, Aditya Putra Ferza
{"title":"开发了将技术因素(TF)和环境因素(EF)增强到用例点(UCP)来计算软件工作量估算的方法","authors":"Sarwosri, Muhammad Jabir Al Haiyan, Mujahid Husein, Aditya Putra Ferza","doi":"10.1109/ICTS.2016.7910299","DOIUrl":null,"url":null,"abstract":"Use Case Point (UCP) is one of many approaches used for software project estimation. This approach is implemented by calculating effort estimation based on prediction a total number of workers and software development time. UCP was fist introduced by Karner on 1993. This approach is widely used. It was because some research on UCP showed that UCP approach is better than those approaches developed by experts. The calculation of effort estimation that was mentioned in the paper (Chetan Nagar, 2011), it has been proven that calculation estimation using UCP sometimes doesn't fit the real effort. This leads to the difference in cost calculation and a total number of workers on software development project.","PeriodicalId":177275,"journal":{"name":"2016 International Conference on Information & Communication Technology and Systems (ICTS)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The development of method of the enhancement of Technical Factor (TF) and Environmental Factor (EF) to the Use Case Point (UCP) to calculate the estimation of software's effort\",\"authors\":\"Sarwosri, Muhammad Jabir Al Haiyan, Mujahid Husein, Aditya Putra Ferza\",\"doi\":\"10.1109/ICTS.2016.7910299\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Use Case Point (UCP) is one of many approaches used for software project estimation. This approach is implemented by calculating effort estimation based on prediction a total number of workers and software development time. UCP was fist introduced by Karner on 1993. This approach is widely used. It was because some research on UCP showed that UCP approach is better than those approaches developed by experts. The calculation of effort estimation that was mentioned in the paper (Chetan Nagar, 2011), it has been proven that calculation estimation using UCP sometimes doesn't fit the real effort. This leads to the difference in cost calculation and a total number of workers on software development project.\",\"PeriodicalId\":177275,\"journal\":{\"name\":\"2016 International Conference on Information & Communication Technology and Systems (ICTS)\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Conference on Information & Communication Technology and Systems (ICTS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICTS.2016.7910299\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Information & Communication Technology and Systems (ICTS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICTS.2016.7910299","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

用例点(UCP)是用于软件项目评估的许多方法之一。这种方法是通过计算基于预测工作人员总数和软件开发时间的工作量估算来实现的。UCP最早是由Karner于1993年提出的。这种方法被广泛使用。这是因为一些关于UCP的研究表明,UCP方法比那些专家开发的方法更好。论文中提到的工作量估算的计算(Chetan Nagar, 2011),已经证明使用UCP的计算估算有时并不适合实际的工作量。这导致了成本计算和软件开发项目中工作人员总数的差异。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The development of method of the enhancement of Technical Factor (TF) and Environmental Factor (EF) to the Use Case Point (UCP) to calculate the estimation of software's effort
Use Case Point (UCP) is one of many approaches used for software project estimation. This approach is implemented by calculating effort estimation based on prediction a total number of workers and software development time. UCP was fist introduced by Karner on 1993. This approach is widely used. It was because some research on UCP showed that UCP approach is better than those approaches developed by experts. The calculation of effort estimation that was mentioned in the paper (Chetan Nagar, 2011), it has been proven that calculation estimation using UCP sometimes doesn't fit the real effort. This leads to the difference in cost calculation and a total number of workers on software development project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信