Sarwosri, Muhammad Jabir Al Haiyan, Mujahid Husein, Aditya Putra Ferza
{"title":"开发了将技术因素(TF)和环境因素(EF)增强到用例点(UCP)来计算软件工作量估算的方法","authors":"Sarwosri, Muhammad Jabir Al Haiyan, Mujahid Husein, Aditya Putra Ferza","doi":"10.1109/ICTS.2016.7910299","DOIUrl":null,"url":null,"abstract":"Use Case Point (UCP) is one of many approaches used for software project estimation. This approach is implemented by calculating effort estimation based on prediction a total number of workers and software development time. UCP was fist introduced by Karner on 1993. This approach is widely used. It was because some research on UCP showed that UCP approach is better than those approaches developed by experts. The calculation of effort estimation that was mentioned in the paper (Chetan Nagar, 2011), it has been proven that calculation estimation using UCP sometimes doesn't fit the real effort. This leads to the difference in cost calculation and a total number of workers on software development project.","PeriodicalId":177275,"journal":{"name":"2016 International Conference on Information & Communication Technology and Systems (ICTS)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The development of method of the enhancement of Technical Factor (TF) and Environmental Factor (EF) to the Use Case Point (UCP) to calculate the estimation of software's effort\",\"authors\":\"Sarwosri, Muhammad Jabir Al Haiyan, Mujahid Husein, Aditya Putra Ferza\",\"doi\":\"10.1109/ICTS.2016.7910299\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Use Case Point (UCP) is one of many approaches used for software project estimation. This approach is implemented by calculating effort estimation based on prediction a total number of workers and software development time. UCP was fist introduced by Karner on 1993. This approach is widely used. It was because some research on UCP showed that UCP approach is better than those approaches developed by experts. The calculation of effort estimation that was mentioned in the paper (Chetan Nagar, 2011), it has been proven that calculation estimation using UCP sometimes doesn't fit the real effort. This leads to the difference in cost calculation and a total number of workers on software development project.\",\"PeriodicalId\":177275,\"journal\":{\"name\":\"2016 International Conference on Information & Communication Technology and Systems (ICTS)\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Conference on Information & Communication Technology and Systems (ICTS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICTS.2016.7910299\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Information & Communication Technology and Systems (ICTS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICTS.2016.7910299","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The development of method of the enhancement of Technical Factor (TF) and Environmental Factor (EF) to the Use Case Point (UCP) to calculate the estimation of software's effort
Use Case Point (UCP) is one of many approaches used for software project estimation. This approach is implemented by calculating effort estimation based on prediction a total number of workers and software development time. UCP was fist introduced by Karner on 1993. This approach is widely used. It was because some research on UCP showed that UCP approach is better than those approaches developed by experts. The calculation of effort estimation that was mentioned in the paper (Chetan Nagar, 2011), it has been proven that calculation estimation using UCP sometimes doesn't fit the real effort. This leads to the difference in cost calculation and a total number of workers on software development project.