{"title":"多站集成的容量规划与经济效益分析","authors":"Mingze Zhang, Xincong Li, Sheng Hua","doi":"10.1109/cieec50170.2021.9510935","DOIUrl":null,"url":null,"abstract":"Multi-station integration is the integration of various stations such as substation, energy storage station, data center, photovoltaic station, and 5G base station. In order to solve the problem of optimal design and coordinated operation of multi-station under the constraints of station conditions, load demand and economic benefits, this paper presented the capacity planning method and economic analysis of each station in multi-station. Firstly, the integration relationship between stations in multi-station was analyzed. Then, the capacity of each station was planned with the goal of maximizing the utilization rate of existing substation site and meeting the demand of surrounding load. Finally, the economic benefit of the configured capacity was analyzed with a case to provide reference for multi-station project.","PeriodicalId":110429,"journal":{"name":"2021 IEEE 4th International Electrical and Energy Conference (CIEEC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Capacity Planning and Economic Benefit Analysis of Multi-station Integration\",\"authors\":\"Mingze Zhang, Xincong Li, Sheng Hua\",\"doi\":\"10.1109/cieec50170.2021.9510935\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Multi-station integration is the integration of various stations such as substation, energy storage station, data center, photovoltaic station, and 5G base station. In order to solve the problem of optimal design and coordinated operation of multi-station under the constraints of station conditions, load demand and economic benefits, this paper presented the capacity planning method and economic analysis of each station in multi-station. Firstly, the integration relationship between stations in multi-station was analyzed. Then, the capacity of each station was planned with the goal of maximizing the utilization rate of existing substation site and meeting the demand of surrounding load. Finally, the economic benefit of the configured capacity was analyzed with a case to provide reference for multi-station project.\",\"PeriodicalId\":110429,\"journal\":{\"name\":\"2021 IEEE 4th International Electrical and Energy Conference (CIEEC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE 4th International Electrical and Energy Conference (CIEEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/cieec50170.2021.9510935\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE 4th International Electrical and Energy Conference (CIEEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/cieec50170.2021.9510935","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Capacity Planning and Economic Benefit Analysis of Multi-station Integration
Multi-station integration is the integration of various stations such as substation, energy storage station, data center, photovoltaic station, and 5G base station. In order to solve the problem of optimal design and coordinated operation of multi-station under the constraints of station conditions, load demand and economic benefits, this paper presented the capacity planning method and economic analysis of each station in multi-station. Firstly, the integration relationship between stations in multi-station was analyzed. Then, the capacity of each station was planned with the goal of maximizing the utilization rate of existing substation site and meeting the demand of surrounding load. Finally, the economic benefit of the configured capacity was analyzed with a case to provide reference for multi-station project.