{"title":"扩建现有公寓楼的配电系统,必要时在大楼内安装充电点使用的能源管理系统","authors":"C. Beermann, P. Mastný","doi":"10.1049/icp.2022.0721","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":268411,"journal":{"name":"CIRED Porto Workshop 2022: E-mobility and power distribution systems","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Expansion of the power distribution system of an existing apartment building, if necessary with energy management system for the use of charging points in the building\",\"authors\":\"C. Beermann, P. Mastný\",\"doi\":\"10.1049/icp.2022.0721\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":268411,\"journal\":{\"name\":\"CIRED Porto Workshop 2022: E-mobility and power distribution systems\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CIRED Porto Workshop 2022: E-mobility and power distribution systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1049/icp.2022.0721\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CIRED Porto Workshop 2022: E-mobility and power distribution systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/icp.2022.0721","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Expansion of the power distribution system of an existing apartment building, if necessary with energy management system for the use of charging points in the building