某修理厂大修线的吞吐量分析

R. Rai, N. Bolia
{"title":"某修理厂大修线的吞吐量分析","authors":"R. Rai, N. Bolia","doi":"10.1504/IJSOM.2016.10000354","DOIUrl":null,"url":null,"abstract":"Industrial engineering concepts are presently not considered in plant performance analysis at repair depots in military aviation (MA). In this paper, the problem of engine overhaul line which is unable to meet its overhaul task is considered. The three major aero engine components that are repaired at industrial engineering line are then identified and shortlisted for analysis. The repair lines are then modelled with the help of workstations and the concepts of variability and queuing models for carrying out throughput (TH) analysis are applied to these three repair lines. The bottlenecks in the repair process of the shortlisted components are identified subsequently followed by discussion on remedial measures. It is demonstrated that incorporation of remedial measures can lead to enhancement of the TH of the three selected components leading to an overall increase in line TH in sync with the target.","PeriodicalId":261328,"journal":{"name":"Repairable Systems Reliability Analysis","volume":"53 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Throughput Analysis of the Overhaul Line of a Repair Depot\",\"authors\":\"R. Rai, N. Bolia\",\"doi\":\"10.1504/IJSOM.2016.10000354\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Industrial engineering concepts are presently not considered in plant performance analysis at repair depots in military aviation (MA). In this paper, the problem of engine overhaul line which is unable to meet its overhaul task is considered. The three major aero engine components that are repaired at industrial engineering line are then identified and shortlisted for analysis. The repair lines are then modelled with the help of workstations and the concepts of variability and queuing models for carrying out throughput (TH) analysis are applied to these three repair lines. The bottlenecks in the repair process of the shortlisted components are identified subsequently followed by discussion on remedial measures. It is demonstrated that incorporation of remedial measures can lead to enhancement of the TH of the three selected components leading to an overall increase in line TH in sync with the target.\",\"PeriodicalId\":261328,\"journal\":{\"name\":\"Repairable Systems Reliability Analysis\",\"volume\":\"53 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Repairable Systems Reliability Analysis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJSOM.2016.10000354\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Repairable Systems Reliability Analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJSOM.2016.10000354","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

工业工程的概念目前没有考虑到工厂性能分析在军事航空维修站(MA)。本文研究了发动机大修线不能完成大修任务的问题。然后确定在工业工程线上维修的三种主要航空发动机部件并进行筛选分析。然后在工作站的帮助下对修复线进行建模,并将进行吞吐量(TH)分析的可变性和排队模型的概念应用于这三条修复线。随后确定了入围部件修复过程中的瓶颈,并讨论了修复措施。研究表明,补救措施的结合可以导致三个选定成分的TH的增强,从而导致与目标同步的线TH的总体增加。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Throughput Analysis of the Overhaul Line of a Repair Depot
Industrial engineering concepts are presently not considered in plant performance analysis at repair depots in military aviation (MA). In this paper, the problem of engine overhaul line which is unable to meet its overhaul task is considered. The three major aero engine components that are repaired at industrial engineering line are then identified and shortlisted for analysis. The repair lines are then modelled with the help of workstations and the concepts of variability and queuing models for carrying out throughput (TH) analysis are applied to these three repair lines. The bottlenecks in the repair process of the shortlisted components are identified subsequently followed by discussion on remedial measures. It is demonstrated that incorporation of remedial measures can lead to enhancement of the TH of the three selected components leading to an overall increase in line TH in sync with the target.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信