{"title":"利用无人机和BIM集成改善基础设施交付——以南非豪登省基础设施发展部为例","authors":"I. Musonda, Nischolan Pillay","doi":"10.3311/ccc2019-127","DOIUrl":null,"url":null,"abstract":"Meeting planned timelines, quality and budget requirements in construction projects is always a challenge and the impact means that resources that should be used in other development projects get re-directed to addressing the problems created by exceeding time, quality and cost aberrations. However, the fourth industrial revolution has not spared the construction industry and it is affecting the way infrastructure is delivered. According to the World Economic Forum, digital technologies have begun to change how infrastructure and the built assets are designed, constructed, operated and maintained. The entry of technology to the industry is also driven by the realization that in order to improve on the delivery of projects, adoption of innovative methods that are based on digital technology is essential as it ensures efficiency and effectiveness in project management, transparency, and record keeping. In this study, we report on the use of drones (Unmanned Aerial Vehicles UAV) to capture site data and how it was integrated to Building Information Modelling (BIM) models to produce as-built drawings and quality checks from comparisons with as-imagined models. Data used in the study was obtained from construction projects sponsored by the Gauteng department of infrastructure, in South Africa. Findings demonstrate that UAV and BIM technology has the potential to improve the efficiency and effectiveness of project delivery. An enhancement in monitoring of work progress during construction, site surveillance, and integration of transformed 3D models to BIM to achieve more effective project management, record keeping, and quality control were observed. The accuracy of the data was also found to be adequate for the purpose of project management tasks. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.","PeriodicalId":231420,"journal":{"name":"Proceedings of the Creative Construction Conference 2019","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Using UAV’s and BIM Integration to Improve Infrastructure Delivery – a Case of Gauteng Department of Infrastructure Development, South Africa\",\"authors\":\"I. Musonda, Nischolan Pillay\",\"doi\":\"10.3311/ccc2019-127\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Meeting planned timelines, quality and budget requirements in construction projects is always a challenge and the impact means that resources that should be used in other development projects get re-directed to addressing the problems created by exceeding time, quality and cost aberrations. However, the fourth industrial revolution has not spared the construction industry and it is affecting the way infrastructure is delivered. According to the World Economic Forum, digital technologies have begun to change how infrastructure and the built assets are designed, constructed, operated and maintained. The entry of technology to the industry is also driven by the realization that in order to improve on the delivery of projects, adoption of innovative methods that are based on digital technology is essential as it ensures efficiency and effectiveness in project management, transparency, and record keeping. In this study, we report on the use of drones (Unmanned Aerial Vehicles UAV) to capture site data and how it was integrated to Building Information Modelling (BIM) models to produce as-built drawings and quality checks from comparisons with as-imagined models. Data used in the study was obtained from construction projects sponsored by the Gauteng department of infrastructure, in South Africa. Findings demonstrate that UAV and BIM technology has the potential to improve the efficiency and effectiveness of project delivery. An enhancement in monitoring of work progress during construction, site surveillance, and integration of transformed 3D models to BIM to achieve more effective project management, record keeping, and quality control were observed. The accuracy of the data was also found to be adequate for the purpose of project management tasks. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.\",\"PeriodicalId\":231420,\"journal\":{\"name\":\"Proceedings of the Creative Construction Conference 2019\",\"volume\":\"77 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Creative Construction Conference 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/ccc2019-127\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Creative Construction Conference 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ccc2019-127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在建设项目中,满足计划的时间表、质量和预算要求始终是一个挑战,其影响意味着本应用于其他开发项目的资源被重新定向到解决因超时、质量和成本异常而产生的问题。然而,第四次工业革命并没有幸免于建筑业,它正在影响基础设施的交付方式。根据世界经济论坛的数据,数字技术已经开始改变基础设施和建筑资产的设计、建造、运营和维护方式。为了改善项目交付,采用基于数字技术的创新方法是必不可少的,因为它确保了项目管理的效率和有效性、透明度和记录保存。在本研究中,我们报告了使用无人机(无人驾驶飞行器UAV)来捕获现场数据,以及如何将其集成到建筑信息模型(BIM)模型中,以生成竣工图纸,并通过与想象模型的比较进行质量检查。研究中使用的数据来自南非豪登省基础设施部门资助的建筑项目。研究结果表明,无人机和BIM技术具有提高项目交付效率和有效性的潜力。在施工过程中加强了对工作进度的监控,现场监控,并将转换后的3D模型集成到BIM中,以实现更有效的项目管理,记录保存和质量控制。数据的准确性也足以满足项目管理任务的需要。©2019作者。由布达佩斯科技经济大学和钻石大会有限公司出版。由2019创意建设大会科学委员会负责同行评审。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Using UAV’s and BIM Integration to Improve Infrastructure Delivery – a Case of Gauteng Department of Infrastructure Development, South Africa
Meeting planned timelines, quality and budget requirements in construction projects is always a challenge and the impact means that resources that should be used in other development projects get re-directed to addressing the problems created by exceeding time, quality and cost aberrations. However, the fourth industrial revolution has not spared the construction industry and it is affecting the way infrastructure is delivered. According to the World Economic Forum, digital technologies have begun to change how infrastructure and the built assets are designed, constructed, operated and maintained. The entry of technology to the industry is also driven by the realization that in order to improve on the delivery of projects, adoption of innovative methods that are based on digital technology is essential as it ensures efficiency and effectiveness in project management, transparency, and record keeping. In this study, we report on the use of drones (Unmanned Aerial Vehicles UAV) to capture site data and how it was integrated to Building Information Modelling (BIM) models to produce as-built drawings and quality checks from comparisons with as-imagined models. Data used in the study was obtained from construction projects sponsored by the Gauteng department of infrastructure, in South Africa. Findings demonstrate that UAV and BIM technology has the potential to improve the efficiency and effectiveness of project delivery. An enhancement in monitoring of work progress during construction, site surveillance, and integration of transformed 3D models to BIM to achieve more effective project management, record keeping, and quality control were observed. The accuracy of the data was also found to be adequate for the purpose of project management tasks. © 2019 The Authors. Published by Budapest University of Technology and Economics & Diamond Congress Ltd. Peer-review under responsibility of the scientific committee of the Creative Construction Conference 2019.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信