科威特高压双回电网屏蔽设计方法

H. M. Ismail
{"title":"科威特高压双回电网屏蔽设计方法","authors":"H. M. Ismail","doi":"10.1109/PTC.1999.826630","DOIUrl":null,"url":null,"abstract":"This paper presents efficient shielding ways for minimizing the electric field at ground surfaces resulting from the three-phase double circuit high voltage transmission lines existing in Kuwait, and in turn reducing the amount of land required as rights-of-ways. The charge simulation method (CSM) is used for field computations. Shielding is offered by two different methods. The first method is by using a vertical grid and the other uses a horizontal grid consisting of a number of grounded wires. The effect of the grid design parameters is extensively studied. The two shielding methods are also applied to reduce the right-of-way widths of two 3-phase double circuits transmission lines running in parallel in Kuwait. Good results have been obtained and shielding grid design parameters have been recommended for those systems.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Shielding design methods for Kuwait high voltage double circuits electrical networks\",\"authors\":\"H. M. Ismail\",\"doi\":\"10.1109/PTC.1999.826630\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents efficient shielding ways for minimizing the electric field at ground surfaces resulting from the three-phase double circuit high voltage transmission lines existing in Kuwait, and in turn reducing the amount of land required as rights-of-ways. The charge simulation method (CSM) is used for field computations. Shielding is offered by two different methods. The first method is by using a vertical grid and the other uses a horizontal grid consisting of a number of grounded wires. The effect of the grid design parameters is extensively studied. The two shielding methods are also applied to reduce the right-of-way widths of two 3-phase double circuits transmission lines running in parallel in Kuwait. Good results have been obtained and shielding grid design parameters have been recommended for those systems.\",\"PeriodicalId\":101688,\"journal\":{\"name\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.1999.826630\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826630","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文提出了有效的屏蔽方法,以尽量减少由科威特现有的三相双回路高压输电线路产生的地面电场,从而减少作为通行权所需的土地数量。采用电荷模拟方法(CSM)进行了现场计算。屏蔽由两种不同的方法提供。第一种方法是使用垂直网格,另一种方法是使用由若干接地线组成的水平网格。对网格设计参数的影响进行了广泛的研究。这两种屏蔽方法也被用于减少科威特两条并联的三相双回输电线路的路权宽度。试验取得了良好的效果,并为这些系统推荐了屏蔽网格设计参数。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Shielding design methods for Kuwait high voltage double circuits electrical networks
This paper presents efficient shielding ways for minimizing the electric field at ground surfaces resulting from the three-phase double circuit high voltage transmission lines existing in Kuwait, and in turn reducing the amount of land required as rights-of-ways. The charge simulation method (CSM) is used for field computations. Shielding is offered by two different methods. The first method is by using a vertical grid and the other uses a horizontal grid consisting of a number of grounded wires. The effect of the grid design parameters is extensively studied. The two shielding methods are also applied to reduce the right-of-way widths of two 3-phase double circuits transmission lines running in parallel in Kuwait. Good results have been obtained and shielding grid design parameters have been recommended for those systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信