基于滑动窗口法的中期批量生产调度方法研究

{"title":"基于滑动窗口法的中期批量生产调度方法研究","authors":"","doi":"10.36652/0869-4931-2022-76-3-114-119","DOIUrl":null,"url":null,"abstract":"This article is devoted to the development of an approach to the volumes redistribution of production and shipments for the purpose of improving the objective functions value for a medium-term production plan built by using the sliding window method. Disadvantage of sliding window method is marked, which consists in excluding the options for long-term accumulation of production from consideration, and proposes an approach to solving this problem, which made it possible to significantly reduce the proportion of contractual obligations not planned for fulfillment.\n\nKeywords\nproduction planning; volumetric scheduling; sliding windows method; lexicographic optimization; petrochemical production; heuristic algorithm","PeriodicalId":309803,"journal":{"name":"Automation. Modern Techologies","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development of an approach to mediumterm volumetric scheduling of production based on the sliding windows method\",\"authors\":\"\",\"doi\":\"10.36652/0869-4931-2022-76-3-114-119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article is devoted to the development of an approach to the volumes redistribution of production and shipments for the purpose of improving the objective functions value for a medium-term production plan built by using the sliding window method. Disadvantage of sliding window method is marked, which consists in excluding the options for long-term accumulation of production from consideration, and proposes an approach to solving this problem, which made it possible to significantly reduce the proportion of contractual obligations not planned for fulfillment.\\n\\nKeywords\\nproduction planning; volumetric scheduling; sliding windows method; lexicographic optimization; petrochemical production; heuristic algorithm\",\"PeriodicalId\":309803,\"journal\":{\"name\":\"Automation. Modern Techologies\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation. Modern Techologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36652/0869-4931-2022-76-3-114-119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation. Modern Techologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36652/0869-4931-2022-76-3-114-119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文致力于开发一种产量和出货量再分配的方法,以改善使用滑动窗口法建立的中期生产计划的目标函数值。指出了滑动窗口法排除了长期生产积累选项的缺点,并提出了解决这一问题的方法,使未计划履行的合同义务比例显著降低。Keywordsproduction规划;体积调度;滑动窗口方法;字典式的优化;石油化工生产;启发式算法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Development of an approach to mediumterm volumetric scheduling of production based on the sliding windows method
This article is devoted to the development of an approach to the volumes redistribution of production and shipments for the purpose of improving the objective functions value for a medium-term production plan built by using the sliding window method. Disadvantage of sliding window method is marked, which consists in excluding the options for long-term accumulation of production from consideration, and proposes an approach to solving this problem, which made it possible to significantly reduce the proportion of contractual obligations not planned for fulfillment. Keywords production planning; volumetric scheduling; sliding windows method; lexicographic optimization; petrochemical production; heuristic algorithm
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信