东北亚互联场景图,韩国电力储备战略

Sang-Seung Lee, Jong-keun Park, S. Moon, J. Moon, Jae-Chul Kim, Seul-Ki Kim, Hoyong Kim
{"title":"东北亚互联场景图,韩国电力储备战略","authors":"Sang-Seung Lee, Jong-keun Park, S. Moon, J. Moon, Jae-Chul Kim, Seul-Ki Kim, Hoyong Kim","doi":"10.1109/PES.2004.1373077","DOIUrl":null,"url":null,"abstract":"The purpose of This work is to obtain the reserve power for the future power shortages faced by the metropolitan areas of the Korean Peninsula and by the southeastern area of the South Korea in North-East Asia. The assumed scenarios will be proposed in the cases of without or with connection to the Sinpo nuclear power plant which is to be constructed with 2,000 MW capacity in the future. In this connection, the types of a power transmission for interconnection consist of the 765 kV HVAC and the HVDC. Here, the various scenarios for providing the interconnection of the power systems among Far-East Russia, North-East China, North Korea, South Korea, and Japan are presented, and the resulting interconnected power systems are simulated by means of a power flow analysis performed with the PSS/E tool. The power flow map is drawn from the data simulated and the comparative study is done.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"419 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":"{\"title\":\"North-East Asia interconnection scenario map, and power reserve strategy in South Korea\",\"authors\":\"Sang-Seung Lee, Jong-keun Park, S. Moon, J. Moon, Jae-Chul Kim, Seul-Ki Kim, Hoyong Kim\",\"doi\":\"10.1109/PES.2004.1373077\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The purpose of This work is to obtain the reserve power for the future power shortages faced by the metropolitan areas of the Korean Peninsula and by the southeastern area of the South Korea in North-East Asia. The assumed scenarios will be proposed in the cases of without or with connection to the Sinpo nuclear power plant which is to be constructed with 2,000 MW capacity in the future. In this connection, the types of a power transmission for interconnection consist of the 765 kV HVAC and the HVDC. Here, the various scenarios for providing the interconnection of the power systems among Far-East Russia, North-East China, North Korea, South Korea, and Japan are presented, and the resulting interconnected power systems are simulated by means of a power flow analysis performed with the PSS/E tool. The power flow map is drawn from the data simulated and the comparative study is done.\",\"PeriodicalId\":236779,\"journal\":{\"name\":\"IEEE Power Engineering Society General Meeting, 2004.\",\"volume\":\"419 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"17\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Power Engineering Society General Meeting, 2004.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2004.1373077\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373077","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

摘要

这项工作的目的是为朝鲜半岛的大都市地区和东北亚的韩国东南部地区未来面临的电力短缺获得备用电力。今后将建设容量为2000兆瓦的新浦核电站,在没有新浦核电站或连接新浦核电站的情况下,将提出上述假设。在这种情况下,用于互联的电力传输类型包括765kv HVAC和HVDC。本文介绍了在俄罗斯远东地区、中国东北地区、朝鲜、韩国和日本之间提供电力系统互联的各种方案,并通过使用PSS/E工具进行的潮流分析模拟了由此产生的互联电力系统。根据仿真数据绘制了功率潮流图,并进行了对比研究。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
North-East Asia interconnection scenario map, and power reserve strategy in South Korea
The purpose of This work is to obtain the reserve power for the future power shortages faced by the metropolitan areas of the Korean Peninsula and by the southeastern area of the South Korea in North-East Asia. The assumed scenarios will be proposed in the cases of without or with connection to the Sinpo nuclear power plant which is to be constructed with 2,000 MW capacity in the future. In this connection, the types of a power transmission for interconnection consist of the 765 kV HVAC and the HVDC. Here, the various scenarios for providing the interconnection of the power systems among Far-East Russia, North-East China, North Korea, South Korea, and Japan are presented, and the resulting interconnected power systems are simulated by means of a power flow analysis performed with the PSS/E tool. The power flow map is drawn from the data simulated and the comparative study is done.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信