基于电力负荷性能指标的500kV爪哇-巴厘输电系统应急分析

L. M. Putranto, Julian Widya Perdana, M. Isnaeni
{"title":"基于电力负荷性能指标的500kV爪哇-巴厘输电系统应急分析","authors":"L. M. Putranto, Julian Widya Perdana, M. Isnaeni","doi":"10.1109/ICITEED.2013.6676263","DOIUrl":null,"url":null,"abstract":"The line outage of a power system may cause overloads on the lines, overvoltage on buses, and undervoltage on buses that can threat the power system security itself. The effect of the contingency of each power system element is vary. Power Load Performance Indexes as one of the contingency indexes can be implemented to rank the contingency level of each power system lines. N-1 contingency line is applied at 500 kV Jawa Bali Transmission System to rank the severe of contingency and to evaluate the effect of contingency of each element. Tanjung Jati-Ungaran line has the biggest contingency index which means it would be the worst scenario of the line outage.","PeriodicalId":204082,"journal":{"name":"2013 International Conference on Information Technology and Electrical Engineering (ICITEE)","volume":"74 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Contingency analysis on 500kV Jawa-Bali Transmission Line System based on Power Load Performance Index\",\"authors\":\"L. M. Putranto, Julian Widya Perdana, M. Isnaeni\",\"doi\":\"10.1109/ICITEED.2013.6676263\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The line outage of a power system may cause overloads on the lines, overvoltage on buses, and undervoltage on buses that can threat the power system security itself. The effect of the contingency of each power system element is vary. Power Load Performance Indexes as one of the contingency indexes can be implemented to rank the contingency level of each power system lines. N-1 contingency line is applied at 500 kV Jawa Bali Transmission System to rank the severe of contingency and to evaluate the effect of contingency of each element. Tanjung Jati-Ungaran line has the biggest contingency index which means it would be the worst scenario of the line outage.\",\"PeriodicalId\":204082,\"journal\":{\"name\":\"2013 International Conference on Information Technology and Electrical Engineering (ICITEE)\",\"volume\":\"74 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 International Conference on Information Technology and Electrical Engineering (ICITEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICITEED.2013.6676263\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 International Conference on Information Technology and Electrical Engineering (ICITEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITEED.2013.6676263","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

电力系统的线路中断可能导致线路过载、母线过压和母线欠压,从而威胁到电力系统的安全。电力系统各要素的偶然性影响各不相同。电力负荷性能指标作为应急指标之一,可以对电力系统各线路的应急水平进行排序。在500kv爪哇巴厘输电系统应用N-1应急线路,对事故的严重程度进行排序,并对各要素的事故影响进行评价。丹戎加地至云加兰线的应急指数最高,这意味着这将是线路中断的最糟糕情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Contingency analysis on 500kV Jawa-Bali Transmission Line System based on Power Load Performance Index
The line outage of a power system may cause overloads on the lines, overvoltage on buses, and undervoltage on buses that can threat the power system security itself. The effect of the contingency of each power system element is vary. Power Load Performance Indexes as one of the contingency indexes can be implemented to rank the contingency level of each power system lines. N-1 contingency line is applied at 500 kV Jawa Bali Transmission System to rank the severe of contingency and to evaluate the effect of contingency of each element. Tanjung Jati-Ungaran line has the biggest contingency index which means it would be the worst scenario of the line outage.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信