在电网中分阶段放置pmu

J. S. Bhonsle, A. Junghare
{"title":"在电网中分阶段放置pmu","authors":"J. S. Bhonsle, A. Junghare","doi":"10.1109/ICACCS.2019.8728322","DOIUrl":null,"url":null,"abstract":"Nowadays power grid are equipped with new technological devices, thereby becoming a Smart grid. Monitoring of electrical quantities by such smart device called PMU is performed to have a better situational awareness. Grid comprises of large number of buses and it is not possible for electric utility to place PMUs in each bus, that too, in a single stage. Therefore PMUs are placed at strategic location in phased manner. In this paper, algorithm is presented to place PMUs phase-wise ensuring the maximum grid observability at each stage. Placement strategy also incorporates any grid expansion scenario, if occurs during complete placement phases. Performance of algorithm is verified on IEEE 14 bus and IEEE 30 bus test system.","PeriodicalId":249139,"journal":{"name":"2019 5th International Conference on Advanced Computing & Communication Systems (ICACCS)","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Staged Placement of PMUs in a Power Grid\",\"authors\":\"J. S. Bhonsle, A. Junghare\",\"doi\":\"10.1109/ICACCS.2019.8728322\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays power grid are equipped with new technological devices, thereby becoming a Smart grid. Monitoring of electrical quantities by such smart device called PMU is performed to have a better situational awareness. Grid comprises of large number of buses and it is not possible for electric utility to place PMUs in each bus, that too, in a single stage. Therefore PMUs are placed at strategic location in phased manner. In this paper, algorithm is presented to place PMUs phase-wise ensuring the maximum grid observability at each stage. Placement strategy also incorporates any grid expansion scenario, if occurs during complete placement phases. Performance of algorithm is verified on IEEE 14 bus and IEEE 30 bus test system.\",\"PeriodicalId\":249139,\"journal\":{\"name\":\"2019 5th International Conference on Advanced Computing & Communication Systems (ICACCS)\",\"volume\":\"119 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 5th International Conference on Advanced Computing & Communication Systems (ICACCS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICACCS.2019.8728322\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 5th International Conference on Advanced Computing & Communication Systems (ICACCS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICACCS.2019.8728322","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

当今电网配备了新的技术设备,从而成为智能电网。通过这种被称为PMU的智能设备监测电量,以获得更好的态势感知。电网由大量的总线组成,电力公司不可能在每个总线上放置pmu,这也是在一个阶段。因此,pmu被分阶段放置在战略位置。本文提出了一种分阶段放置pmu的算法,保证每一阶段的网格可观测性最大。放置策略还包含任何网格扩展场景,如果发生在完整的放置阶段。在ieee14总线和ieee30总线测试系统上验证了算法的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Staged Placement of PMUs in a Power Grid
Nowadays power grid are equipped with new technological devices, thereby becoming a Smart grid. Monitoring of electrical quantities by such smart device called PMU is performed to have a better situational awareness. Grid comprises of large number of buses and it is not possible for electric utility to place PMUs in each bus, that too, in a single stage. Therefore PMUs are placed at strategic location in phased manner. In this paper, algorithm is presented to place PMUs phase-wise ensuring the maximum grid observability at each stage. Placement strategy also incorporates any grid expansion scenario, if occurs during complete placement phases. Performance of algorithm is verified on IEEE 14 bus and IEEE 30 bus test system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信