AHP多准则模型应用于巴西东南部某公用事业公司的输电扩展

E. A. A. Aranha Neto, J. Coelho, C. Camargo, A. Rodigheri, M. M. Reis, L. Cimino, R. G. Ribeiro, A. O. Reinig
{"title":"AHP多准则模型应用于巴西东南部某公用事业公司的输电扩展","authors":"E. A. A. Aranha Neto, J. Coelho, C. Camargo, A. Rodigheri, M. M. Reis, L. Cimino, R. G. Ribeiro, A. O. Reinig","doi":"10.1109/TDC-LA.2010.5762940","DOIUrl":null,"url":null,"abstract":"This paper proposes the application of a multiple criteria methodology in the implementation management of authorized or not authorized yet (by the Brazilian regulation agency) reinforcements of substations and transmission lines. The presented algorithm is capable of measuring the degree of value that each reinforcement aggregates to the company, considering the transmission agent vision, represented by a set of criteria simultaneously applied, ranking and valuing the reinforcements and thereby assisting the decision making process of the referred implementations. The adopted method is the Analytic Hierarchy Process (AHP). The developed methodology was applied to a transmission system with more than one hundred reinforcements of a Brazilian southeastern transmission utility (CTEEP), ranking and valuing the projects, thereby facilitating decision-making regarding their implementation.","PeriodicalId":222318,"journal":{"name":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"An AHP multiple criteria model applied to transmission expansion of a Brazilian southeastern utility\",\"authors\":\"E. A. A. Aranha Neto, J. Coelho, C. Camargo, A. Rodigheri, M. M. Reis, L. Cimino, R. G. Ribeiro, A. O. Reinig\",\"doi\":\"10.1109/TDC-LA.2010.5762940\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper proposes the application of a multiple criteria methodology in the implementation management of authorized or not authorized yet (by the Brazilian regulation agency) reinforcements of substations and transmission lines. The presented algorithm is capable of measuring the degree of value that each reinforcement aggregates to the company, considering the transmission agent vision, represented by a set of criteria simultaneously applied, ranking and valuing the reinforcements and thereby assisting the decision making process of the referred implementations. The adopted method is the Analytic Hierarchy Process (AHP). The developed methodology was applied to a transmission system with more than one hundred reinforcements of a Brazilian southeastern transmission utility (CTEEP), ranking and valuing the projects, thereby facilitating decision-making regarding their implementation.\",\"PeriodicalId\":222318,\"journal\":{\"name\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC-LA.2010.5762940\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2010.5762940","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文提出在变电站和输电线路的授权或尚未授权(巴西监管机构)加固的实施管理中应用多标准方法。所提出的算法能够衡量每个加固对公司的价值程度,考虑到传输代理的视觉,由一组同时应用的标准表示,对加固进行排名和评估,从而协助所述实施的决策过程。采用层次分析法(AHP)。将所开发的方法应用于巴西东南部输电公用事业公司(CTEEP)的100多个增强型输电系统,对项目进行排名和评估,从而促进对其实施的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An AHP multiple criteria model applied to transmission expansion of a Brazilian southeastern utility
This paper proposes the application of a multiple criteria methodology in the implementation management of authorized or not authorized yet (by the Brazilian regulation agency) reinforcements of substations and transmission lines. The presented algorithm is capable of measuring the degree of value that each reinforcement aggregates to the company, considering the transmission agent vision, represented by a set of criteria simultaneously applied, ranking and valuing the reinforcements and thereby assisting the decision making process of the referred implementations. The adopted method is the Analytic Hierarchy Process (AHP). The developed methodology was applied to a transmission system with more than one hundred reinforcements of a Brazilian southeastern transmission utility (CTEEP), ranking and valuing the projects, thereby facilitating decision-making regarding their implementation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信