{"title":"山区公路桥梁滑坡破坏模式分析","authors":"Zhongyang Sun, Wuhao Chen","doi":"10.26689/jwa.v7i3.4856","DOIUrl":null,"url":null,"abstract":"Through on-site defect investigation, special inspection, and finite element simulation calculation of a high-speed upper-span (30 + 32 + 30) m prestressed concrete box girder bridge, the overall sliding force of the bridge on the right side of platform 0# is analyzed. In this situation, typical defects such as overall girder slippage, support dislocation, pier column deviation, and pier bottom side cracks have occurred in the overpass. At the same time, combined with simulation calculation analysis, it is interpreted that the 0# and 1# foundation has been damaged at a certain position below the ground line. The occurrence of broken piles has provided a reliable basis for the later reinforcement and maintenance of the bridge and ideas for emergency inspection and analysis of bridges damaged by the same type of landslides.","PeriodicalId":122520,"journal":{"name":"Journal of World Architecture","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Damage Pattern of Road Bridge Landslide in Mountainous Area\",\"authors\":\"Zhongyang Sun, Wuhao Chen\",\"doi\":\"10.26689/jwa.v7i3.4856\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Through on-site defect investigation, special inspection, and finite element simulation calculation of a high-speed upper-span (30 + 32 + 30) m prestressed concrete box girder bridge, the overall sliding force of the bridge on the right side of platform 0# is analyzed. In this situation, typical defects such as overall girder slippage, support dislocation, pier column deviation, and pier bottom side cracks have occurred in the overpass. At the same time, combined with simulation calculation analysis, it is interpreted that the 0# and 1# foundation has been damaged at a certain position below the ground line. The occurrence of broken piles has provided a reliable basis for the later reinforcement and maintenance of the bridge and ideas for emergency inspection and analysis of bridges damaged by the same type of landslides.\",\"PeriodicalId\":122520,\"journal\":{\"name\":\"Journal of World Architecture\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of World Architecture\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26689/jwa.v7i3.4856\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of World Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26689/jwa.v7i3.4856","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

通过对某高速上跨(30 + 32 + 30)m预应力混凝土箱梁桥的现场缺陷调查、专项检查和有限元模拟计算,分析了该桥在0#平台右侧的整体滑动力。在这种情况下,立交桥出现了整体梁滑移、支座错位、桥墩柱偏差、桥墩底边裂缝等典型缺陷。同时,结合模拟计算分析,解释0#、1#基础在地线下一定位置已发生破坏。断桩的发生为桥梁后期的加固和维修提供了可靠的依据,也为同类型滑坡破坏桥梁的应急检测分析提供了思路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Damage Pattern of Road Bridge Landslide in Mountainous Area
Through on-site defect investigation, special inspection, and finite element simulation calculation of a high-speed upper-span (30 + 32 + 30) m prestressed concrete box girder bridge, the overall sliding force of the bridge on the right side of platform 0# is analyzed. In this situation, typical defects such as overall girder slippage, support dislocation, pier column deviation, and pier bottom side cracks have occurred in the overpass. At the same time, combined with simulation calculation analysis, it is interpreted that the 0# and 1# foundation has been damaged at a certain position below the ground line. The occurrence of broken piles has provided a reliable basis for the later reinforcement and maintenance of the bridge and ideas for emergency inspection and analysis of bridges damaged by the same type of landslides.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信